4.7 Article

MIP modeling of energy-conscious FJSP and its extended problems:From simplicity to complexity

Journal

EXPERT SYSTEMS WITH APPLICATIONS
Volume 241, Issue -, Pages -

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.eswa.2023.122594

Keywords

Energy-conscious; Mixed integer programming; Flexible job shop scheduling problem; Transportation time; Sequence-dependent setup time

Ask authors/readers for more resources

This study developed thirteen mixed integer programming models to solve four different energy-conscious scheduling problems. The models were designed using different modeling ideas and linearization techniques. Experimental results showed the effectiveness and differences of the proposed MIP models.
Regarding four different energy-conscious scheduling problems, namely, flexible job shop scheduling problem (FJSP), FJSP with transportation time (FJSP-T), FJSP with sequence-dependent setup time (FJSP-SDST), and FJSP with both transportation time and sequence-dependent setup time (FJSP-SDST-T), thirteen mixed integer programming (MIP) models are developed to optimally solve the problems. These models include three nonlinear models and ten linear models, and they are designed from three different modeling ideas, namely, sequencebased modeling idea, adjacent sequence-based modeling idea and machine-position based modeling idea. For each modeling idea, the MIP models are formulated by following the principle: from the simplest FJSP to the most complex FJSP-SDST-T. Regarding nonlinear MIP models, different linearization techniques are used to obtain different linear models. Comparison experiments are conducted from both size and computational complexities to evaluate the models of different modeling ideas for the same problem, the models of the same modeling ideas for the same problem, the models of the same modeling idea for different problems and the models of different modeling ideas for different problems. Experimental results indicate the effectiveness and differences of the proposed MIP models. Specifically, in terms of the average percentage deviation of obtained solution (APE), for FJSP, the machine-position based model with APE being 0.30 outperforms the sequence and adjacent sequence-based models with APE being 0.34 and 3.0 respectively. For FJSP-T, the best sequence-based model with APE being 0.22 outperforms the best machine-position based model with APE being 0.79. For FJSPSDST, the machine-position based model with APE being 0.06 outperforms adjacent sequence-based model with APE being 1.35.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available