Evaluation of common TBM performance prediction models based on field data from the second lot of Zagros water conveyance tunnel (ZWCT2)

Journal

TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
Volume 52, Issue -, Pages 147-156

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.tust.2015.12.006

Keywords

TBM performance; Rate of penetration; Empirical models; Theoretical models

Ask authors/readers for more resources

Zagros water conveyance tunnel (ZWCT) is a 49 km tunnel designed for conveying 70 m(3)/s water from Sirvan River southward to Dashte Zahab plain in western Iran. This long tunnel has been divided in 3 Lots namely 1A, 1B, 2. By November 2014, about 22 km of the Lot 2 (with a total length of 26 km) has been excavated by two double shield TBMs from two southern and northern portals. The bored section of tunnel passed through different geological units of 3 main formations of Zagros mountain ranges which mainly consist of weak to moderately strong argillaceous-carbonate sedimentary rocks. In this paper, the operating and as-built geological data collected during construction phase of the Lot 2 of ZWCT project was used to compare the calculated machine performance by empirical methods such as the Hassanpour et al. (2011), Q(TBM), NTNU, Palmstrom, and theoretical model of Colorado School of Mines or CSM. The predicted penetration rates were then compared with the observed field performance of the machine and the variations of predicted rates were examined by statistical analysis. The results showed that the site-specific model, which was based on TBM performance in similar formations can provide estimates closer to actual machine performance. (C) 2015 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available