4.3 Article

Acid mine drainage analysis for the Reddale Coal Mine, Reefton, New Zealand

Journal

NEW ZEALAND JOURNAL OF GEOLOGY AND GEOPHYSICS
Volume 59, Issue 2, Pages 341-351

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/00288306.2016.1148056

Keywords

Acid mine drainage (AMD); Brunner Coal Measures (BCM); geochemical characterisation; NAG pH; paste pH

Funding

  1. Solid Energy New Zealand Ltd
  2. CRL Energy Ltd
  3. Ministry for Business, Innovation and Employment

Ask authors/readers for more resources

The Reddale Coal Mine is located within the Brunner Coal Measures, which are often assumed to be potentially acid-forming rocks that will release acidity when disturbed by mining. The pre-mining assessment of the site acid mine drainage (AMD) potential assumed overburden acid-neutralising capacity was negligible, similar to Brunner Coal Measures in other areas, and that AMD would occur almost immediately. Column trials using poorly stored and partially oxidised drill core indicated potentially acid-forming (PAF) overburden readily produced acidity with no lag period. Based on the pre-mining assessment, a Ca(OH)(2) dosing plant was constructed for AMD management. Once mining commenced, tiphead samples collected during construction of the Ferndale engineered landform showed that the net acid-producing potential of the potentially acid-forming overburden was overestimated by about one-third when acid-neutralising capacity and non-sulphide forms of sulphur were accounted for. When coupled with material properties which resulted in good compaction of waste rock, construction of the engineered landform in 4m lifts to minimise convective oxygen flux and aglime (<2.5mm CaCO3) amendments to each lift, acidity loads from the Ferndale engineered landform were negligible. Compliance monitoring downstream of the mine site at Red4 shows that, to date, site discharge pH has remained circum-neutral. Pre-mining AMD management decisions, primarily construction of a Ca(OH)(2) dosing plant that was never commissioned, therefore proved overly conservative. The timing and expense of AMD management has the potential to influence project feasibility and needs to be well understood.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.3
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available