Managing the high capital cost of prefabricated construction through stakeholder collaboration: a two-mode network analysis

Publisher

EMERALD GROUP PUBLISHING LTD
DOI: 10.1108/ECAM-04-2023-0392

Keywords

Prefabricated construction (PC); Cost influencing factors (CIFs); Stakeholder attributes; Two-mode network; Collaboration

Ask authors/readers for more resources

This study aims to explore the collaboration paths of stakeholders in solving critical cost influencing factors (CIFs) of prefabricated construction (PC) to reduce costs. Stakeholders mainly show willingness and potential to collaborate on organization and management factors, while paying attention to incentive policies and prefabrication rates. The findings not only provide guidance for stakeholders to find potential partners and optimize resource allocation, but also facilitate sustainable collaboration to achieve PC's cost performance.
PurposePrefabricated construction (PC) can benefit construction industry due to its high efficiency, energy saving, consumption reduction and safety. However, the high capital cost is a critical challenge hindering its development in China. The collaboration of PC stakeholders is conducive to improving cost management efficiency and optimizing resource allocation which has been ignored in previous studies. Therefore, this study aims to explore the collaboration paths of stakeholders in the process of solving critical cost influencing factors (CIFs) of PC to reduce costs.Design/methodology/approachFirstly, 25 CIFs and five main stakeholders that affect PC capital cost were identified through literature research and expert interviews. Then, questionnaires were used to investigate the relationship between stakeholders and CIFs from the perspectives of three stakeholder attributes of proximity, attitude and power, respectively. Finally, based on the survey data, three stakeholder-CIF networks from three attributes perspective and a comprehensive network were constructed and used for subsequent social network analysis.Findings(1) Stakeholders mainly show willingness and potential to collaborate on organization and management factors; (2) More stakeholders pay attention to incentive policies and the setting of prefabrication rates and assembly rates, while all stakeholders have the right to facilitate information and resource sharing in the PC supply chain; (3) The comprehensive network shows a core-periphery structure. As core stakeholders, contractor, designer and manufacturer are more likely to actively manage the 14 core CIFs.Originality/valueThis paper innovatively combined stakeholder and cost management in PC, and used two-mode network based on three stakeholder perspectives to reveal the collaboration potential and motivation of stakeholders in PC cost management. The findings not only provide guidance for stakeholders to find potential partners and optimize resource allocation in solving specific cost issues, but also facilitate stakeholders' sustainable collaboration to achieve PC's cost performance.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available