4.5 Article

Incorporating photovoltaic inverter capability into stochastic optimal reactive power dispatch through an enhanced artificial gorilla troops optimizer

Journal

IET RENEWABLE POWER GENERATION
Volume -, Issue -, Pages -

Publisher

INST ENGINEERING TECHNOLOGY-IET
DOI: 10.1049/rpg2.12841

Keywords

optimal reactive power dispatch; optimization; PV inverters capability; uncertainty

Ask authors/readers for more resources

This study proposes an enhanced Artificial Gorilla Troops Optimizer (EGTO) to solve the stochastic optimal reactive power dispatch (SORPD) problem considering uncertainties in load demand and generated power, as well as the reactive power generation capability of photovoltaic (PV) systems. The algorithm is applied on the IEEE 30-bus system and compared with other optimization algorithms, demonstrating improved performance by incorporating the PV unit.
This study addresses the challenging task of solving optimal reactive power dispatch (ORPD) while incorporating renewable energy resources (RERs), considering their stochastic and time-varying nature. Specifically, the focus is on solving the stochastic optimal reactive power dispatch (SORPD) problem, taking into account uncertainties in load demand and generated power, as well as the reactive power generation capability of photovoltaic (PV) systems. To tackle this problem, an enhanced Artificial Gorilla Troops Optimizer (EGTO) is proposed, which utilizes multiple strategies. The objective is to minimize power loss and improve voltage profile and system stability under uncertain conditions. The algorithm is applied and tested on the IEEE 30-bus system, both with and without the STATCOM functionality of the PV system. A comparison is conducted against other well-known optimization algorithms. The results demonstrate the significant improvement achieved by incorporating the PV unit. The inclusion of the PV system leads to reduced expected power losses, voltage deviations, and improved voltage stability. Specifically, without and with the STATCOM functionality, the expected power loss decreases from 5.9218 MW at the base case to 1.1419 MW and 1.1197 MW, respectively. Similarly, the expected voltage deviation decreases from 1.9320 p.u. to 0.0909 p.u. and 0.0893 p.u., respectively, and the expected voltage stability decreases from 0.1336 p.u. to 0.07199 p.u. and 0.07142 p.u., respectively.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available