Related references
Note: Only part of the references are listed.A genetic programming learning approach to generate dispatching rules for flexible shop scheduling problems
Roland Braune et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2022)
Robust optimization of resource-constrained assembly line balancing problems with uncertain operation times
Wenrui Jin et al.
ENGINEERING COMPUTATIONS (2022)
A reactive scheduling method for disturbances in aircraft moving assembly line
Hongwei Zhu et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2021)
Integration of balancing and preventive maintenance in straight and U-shaped resource-dependent assembly lines: MILP model and memetic algorithm
Zikai Zhang et al.
APPLIED SOFT COMPUTING (2021)
Flexible Worker Allocation in Aircraft Final Assembly Line Using Multiobjective Evolutionary Algorithms
Pengcheng Fang et al.
IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS (2021)
A Mathematical Model for an Integrated Assembly Line Regarding Learning and Fatigue Effects
Reza Eslamipoor et al.
ROBOTICA (2021)
General resource-constrained assembly line balancing problem: conjunction normal form based constraint programming models
Haci Mehmet Alakas
SOFT COMPUTING (2021)
Fuzzy multi-objective model for assembly line balancing with ergonomic risks consideration
Rifat Ozdemir et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2021)
Sequence-Based Selection Hyper-Heuristic Model via MAP-Elites
Melissa Sanchez et al.
IEEE ACCESS (2021)
Eco-friendly multi-skilled worker assignment and assembly line balancing problem
Rongfan Liu et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2021)
A systematic review of research themes and hot topics in assembly line balancing through the web of science within 1990-2017
Mahmood Eghtesadifard et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2020)
A branch-and-bound embedded genetic algorithm for resource-constrained project scheduling problem with resource transfer time of aircraft moving assembly line
Yifei Ren et al.
OPTIMIZATION LETTERS (2020)
Evolutionary optimization using epsilon method for resource-constrained multi-robotic disassembly line balancing
Yilin Fang et al.
JOURNAL OF MANUFACTURING SYSTEMS (2020)
A branch-and-bound approach to schedule a no-wait flow shop to minimize the CVaR of the residual work content
M. Urgo
COMPUTERS & INDUSTRIAL ENGINEERING (2019)
A flexible resource investment problem based on project splitting for aircraft moving assembly line
Yifei Ren et al.
ASSEMBLY AUTOMATION (2019)
A new mixed-integer linear programming formulation and particle swarm optimization based hybrid heuristic for the problem of resource investment and balancing of the assembly line with multi-manned workstations
Murat Sahin et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2019)
A resource investment problem based on project splitting with time windows for aircraft moving assembly line
Zhiqiang Lu et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2019)
Resource-constrained assembly line balancing problems with multi-manned workstations
Yin-Yann Chen et al.
JOURNAL OF MANUFACTURING SYSTEMS (2018)
Hybrid genetic algorithm to solve resource constrained assembly line balancing problem in footwear manufacturing
Nguyen Thi Phuong Quyen et al.
SOFT COMPUTING (2017)
Resource efficient configuration of an aircraft assembly line
Alessandra Caggiano et al.
RESEARCH AND INNOVATION IN MANUFACTURING: KEY ENABLING TECHNOLOGIES FOR THE FACTORIES OF THE FUTURE - PROCEEDINGS OF THE 48TH CIRP CONFERENCE ON MANUFACTURING SYSTEMS (2016)
An adaptive BPSO algorithm for multi-skilled workers assignment problem in aircraft assembly lines
Bo Xin et al.
ASSEMBLY AUTOMATION (2015)
A branch and bound method for the line balancing problem in U-shaped assembly lines with equipment requirements
Dilek Ogan et al.
JOURNAL OF MANUFACTURING SYSTEMS (2015)
A priority rule-based constructive heuristic and an improvement method for balancing assembly lines with parallel multi-manned workstations
Talip Kellegoz et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2015)
Enhanced Assembly Line Balancing and Scheduling Methodology for the Aeronautical Industry
T. Borreguero et al.
MESIC MANUFACTURING ENGINEERING SOCIETY INTERNATIONAL CONFERENCE 2015 (2015)
A taxonomy of line balancing problems and their solution approaches
Olga Battaia et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2013)
Hawker Beechcraft Uses a New Solution Approach to Balance Assembly Lines
Sue Abdinnour
INTERFACES (2011)
Assembly line balancing: general resource-constrained case
Albert Corominas et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2011)
A classification of assembly line balancing problems
Nils Boysen et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2007)
A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
Shahram Shadrokh et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2007)
State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
A Scholl et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2006)
Assembly line balancing:: Two resource constrained cases
K Agpak et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2005)