4.2 Article

Nickel removal from an industrial effluent by electrocoagulation in semi-continuous operation: Hydrodynamic, kinetic and cost analysis

Journal

RESULTS IN ENGINEERING
Volume 17, Issue -, Pages -

Publisher

ELSEVIER
DOI: 10.1016/j.rineng.2023.100961

Keywords

Electrocoagulation; Kinetics; Layered double hydroxide; Nickel; Residence time distribution

Ask authors/readers for more resources

In this study, the scaling-up of the electro-coagulation (EC) process for nickel removal was evaluated through hydrodynamic, kinetic, and operating cost analysis. Four semi-continuous stirred-tank electrochemical reactors were designed and tested. The maximum nickel removal efficiency reached 97.8% under specific operation conditions, with an operating cost of $1.008/kg Ni.
In the nickel and cobalt production plant located in Punta-Gorda Cuba, an effluent liquor is obtained with several pollutants species of Ni(II)-NH3-CO2-SO2-H2O system. In previous studies the performance of electro-coagulation (EC) for the nickel removal from this effluent was demonstrated on a lab-scale and bench-scale. In this research, geometric, electrical and equilibrium parameters used as criteria for scaling-up the EC process were evaluated through hydrodynamic, kinetic and operating cost analysis. For this purpose, four semi-continuous stirred-tank electrochemical reactors of equal sized with 200 L useful volume were design. Based on the resi-dence time distribution (RTD) curve, the hydrodynamic behavior of EC systems followed multi-branch tanks-in-series model. Experimental mean residence time was of 92 min and hydraulic efficiency 92% for a liquor flow rate 2 L center dot min- 1, due to the presence of short-circuit, internal recirculation and 3% dead zone. Then, at the operating parameters: nickel concentration 277 +/- 52 mg L-1, current density 6.26 mA cm-2, pH 8.40 +/- 0.28 and temperature 50 +/- 2 degrees C, the maximum nickel removal was 97.8% with an operating cost $1.008 kg-1 Ni. Combination of RTD model and the conversion time kinetic model (CTV) was presented to predict the removal efficiency with successful outcomes, and the time for complete conversion was 23.3 min under control of chemical reaction. The precipitate presented a nickel concentration of 35.71 +/- 2.13%, aluminum 6.05 +/- 0.83%, true density 2836 +/- 449 kg m- 3 and typical layered structure. These results suggest the opportunity for the projection of an industrial production unit of double lamellar hydroxide and reduce the adverse environmental impact.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.2
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available