4.7 Article

Run-out prediction and failure mechanism analysis of the Zhenggang deposit in southwestern China

Journal

LANDSLIDES
Volume 14, Issue 2, Pages 719-726

Publisher

SPRINGER HEIDELBERG
DOI: 10.1007/s10346-016-0770-y

Keywords

Landslide run-out prediction; Failure mechanism analysis; Discrete element method (DEM); The henggang deposit

Funding

  1. National Key Technology R&D Program of China [2013BAB06B00]
  2. National Natural Science Foundation of China [50911130366, 51309089]
  3. Fundamental Research Funds for the Central Universities of China [KYLX_0441]

Ask authors/readers for more resources

Due to the intensive rainfalls in October 2008 and the heavy snowfalls in February 2009, the Zhenggang deposit exhibited a high probability of landslide reactivation. A good understanding in landslide run-out prediction and failure mechanism analysis was thus highly urgent. In this study, the landslide dynamic simulations were performed for studying the run-out prediction and the failure mechanism of the Zhenggang deposit. The impacts of the friction coefficient at sliding surface and the contact damping ratio on landslide run-out were investigated. The potential improvement of the proposed landslide run-out modeling was discussed.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available