4.7 Article

Full-scale utilization of geothermal energy: A high-efficiency CO2 hybrid cogeneration system with low-temperature waste heat

Journal

JOURNAL OF CLEANER PRODUCTION
Volume 403, Issue -, Pages -

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.jclepro.2023.136866

Keywords

Geothermal energy; Full-scale utilization; CO 2 hybrid cogeneration system; Waste heat; Techno-economic analysis

Ask authors/readers for more resources

Geothermal energy utilization is crucial in the transition to sustainable energy sources. A hybrid geothermal system that uses CO2 as the working fluid can generate electricity and utilize waste heat and GSHPs for heating. This system has the potential to effectively utilize geothermal energy for a sustainable future.
The utilization of geothermal energy is becoming increasingly important in the current transition towards sus-tainable energy sources. Among the various methods of utilizing geothermal energy, the use of hybrid geothermal power plants that exploit CO2 fluid for preheating in electricity generation has been identified as an attractive approach. Additionally, the shallow ground source heat pump (SGSHP) has been proven to be superior in previous experimental studies. However, the full-scale utilization of geothermal energy, through generating electricity from geothermal power plants and applying waste heat with SGSHPs for auxiliary heating, needs further exploration. This study proposes a novel CO2 hybrid geothermal system that incorporates a GSHP heating system. The hybrid geothermal system uses CO2 as the underground working fluid, and the electricity and waste heat are used to assist the GSHP for heating, ventilation, and air conditioning. The proposed system can produce 11.41 MW of electricity, 80 degrees C of hot water, and 34.76 MW of cold energy by driving 50 MW of the geothermal heat. Through a comprehensive analysis of the economy, energy, exergy, and environment, the results demon-strate that the maximum exergy damage of the refrigeration power cycle is 37999.33 kW, which has the highest exergy losses. The exergy loss of the steam turbine heat power conversion in the geothermal power generation process is the highest, but this loss can be effectively reduced through heat integration. The optimal cooling temperature of the coupled system should be set at 8 degrees C, and it has a good investment prospect. In summary, the CO2 hybrid geothermal system can realize effective cogeneration and fully utilize geothermal energy. Therefore, it has great potential to contribute to the transition towards a sustainable energy future.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available