Uncertainties-Based Potential Time and Cost Overrun Assessment While Planning a Hydropower Project

Publisher

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/AJRUA6.0001270

Keywords

Hydropower development; Risk; Fuzzy inference system; Bayesian network; Analytic hierarchy process; Time overrun; Cost overrun

Funding

  1. Ministry of Human Resources Development (MHRD), GoI

Ask authors/readers for more resources

This study proposes an expert fuzzy-based system for assessing the impact of uncertainties on time and cost overrun in hydropower projects. Bayesian network analysis and fuzzy inference system are utilized to incorporate expert opinions and decision maker's approaches. The methodology is demonstrated using a specific hydroelectric project in India, and the results indicate the range of time and cost overruns under optimistic and pessimistic conditions.
Uncertainties are predominant in hydropower development that lead to risks of time and cost overruns. The overruns' assessment requires quantitative data that is difficult to obtain and sometimes partially or completely unavailable. Accordingly, this study proposes an expert fuzzy-based system for assessing the impact of uncertainties on time and cost overrun. A Bayesian network analysis is used wherein the experts' opinions are incorporated through an analytic hierarchy process for the uncertainty's likelihood and impact. A fuzzy inference system is used to incorporate the decision maker's optimistic and pessimistic approaches. The proposed methodology is illustrated through a 3 x 42 MW run-of-river Myntdu Leshka Hydroelectric project in India. The project's initial likely completion time was five years with a cost of (sic)3,630 million at the 1999 price level. The results state that the project's time and cost overruns lie between 158% and 196% and between 235% and 276%, respectively, under optimistic and pessimistic conditions. Such a methodology has not been applied by past studies for hydropower projects, which is the study's main contribution. The methodology can be easily applied by construction project developers globally in different fields by varying the uncertainties, their likelihood, and impact scales as per different risk perceptions and regional conditions. (C) 2022 American Society of Civil Engineers.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.4
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available