4.7 Article

Resilience-Based Surrogate Robustness Measure and Optimization Method for Robust Job-Shop Scheduling

Journal

MATHEMATICS
Volume 10, Issue 21, Pages -

Publisher

MDPI
DOI: 10.3390/math10214048

Keywords

production resilience; robust job-shop scheduling; surrogate robustness measure; disturbance propagation; optimization algorithm

Categories

Funding

  1. Soft Science Key Project of Shanghai Science and Technology Innovation Action Plan [20692193300]
  2. National Natural Science Foundation of China [U1904211]
  3. Fundamental Research Funds for the Central Universities [9160421005]
  4. Shanghai University Young Teacher Training Grant Program [ZZSH20010]

Ask authors/readers for more resources

This paper addresses the robust job-shop scheduling problems with stochastic deteriorating processing times by considering the resilience of the production schedule. A surrogate model for robust scheduling is proposed, which can optimize both the schedule performance and robustness of RJSSP. The proposed SRM-R considers the production resilience and can utilize the available information on stochastic deteriorating processing times and slack times in the schedule structure by analyzing the disturbance propagation of the correlated operations.
This paper addresses the robust job-shop scheduling problems (RJSSP) with stochastic deteriorating processing times by considering the resilience of the production schedule. To deal with the disturbances caused by the processing time variations, the expected deviation between the realized makespan and the initial makespan is adopted to measure the robustness of a schedule. A surrogate model for robust scheduling is proposed, which can optimize both the schedule performance and robustness of RJSSP. Specifically, the computational burden of simulation is considered a deficiency for robustness evaluation under the disturbance of stochastic processing times. Therefore, a resilience-based surrogate robustness measure (SRM-R) is provided for the robustness estimation in the surrogate model. The proposed SRM-R considers the production resilience and can utilize the available information on stochastic deteriorating processing times and slack times in the schedule structure by analyzing the disturbance propagation of the correlated operations in the schedule. Finally, a multi-objective hybrid estimation of distribution algorithm is employed to obtain the Pareto optimal solutions of RJSSP. The simulation experiment results show that the presented SRM-R is effective and can provide the Pareto solutions with a lower computational burden. Furthermore, an RJSSP case derived from the manufacturing environment demonstrates that the proposed approach can generate satisfactory robust solutions with significantly improved computational efficiency.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available