Theoretical Analysis of Rock Blasting Damage in Construction of Tunnels Closely Under-Passing Sewage Box Culverts

Journal

APPLIED SCIENCES-BASEL
Volume 12, Issue 19, Pages -

Publisher

MDPI
DOI: 10.3390/app12199875

Keywords

rock tunnel; blasting; rock damage; numerical modeling

Funding

  1. Science and Technology Project of China Railway 20th Bureau Group Co., Ltd., China Postdoctoral Science Foundation [20060390165]

Ask authors/readers for more resources

With the large-scale construction of urban traffic tunnels in China, the use of drilling-blasting method to underpass existing buildings and structures has become common. This paper proposes an improved damage model and applies it to evaluate the blasting construction of rock tunnels closely under-passing sewage box culverts. The numerical simulation results show that the safe distance between the tunnel and box culvert should be no less than 4.0 m.
With the large-scale construction of urban traffic tunnels in China, it has become common to underpass existing buildings and structures such as sewage box culverts and pipelines using the drilling-blasting method. How to analyze accurately the blasting damage of surrounding rock and reasonably determine the safe distance between tunnel and box culvert or pipelines is an urgent issue to be solved. In this paper, the Cowper-Symonds plastic kinetic hardening model was improved using both rock initial damage degree and damage modification coefficient considering rock residual strength. The proposed model was implemented into LS-DYNA. The proposed damage model was used to evaluate the blasting construction of rock tunnels closely under-passing sewage box culverts. The results of numerical simulation using the proposed damage model shows that the blasting damage range of rock with a damage degree of more than 0.5 very significantly reduces from 1.0 m to 0.3 m as the spacing between the box culvert and the tunnel increases from 1.0 m to 4.0 m, and the evolution process of rock blasting damage can be well-presented. Moreover, the safe distance between tunnel and box culvert in blasting construction can be reasonably determined to be no less than 4.0 m. The findings in this paper could be significant for guiding the blasting construction of rock tunnels closely under-passing sewage box culverts.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available