4.7 Article

Introducing New Index in Forest Roads Pavement Management System

Journal

FORESTS
Volume 13, Issue 10, Pages -

Publisher

MDPI
DOI: 10.3390/f13101674

Keywords

forest road distress; pavement management system; unpaved road index; maintenance; deterioration

Categories

Ask authors/readers for more resources

This research evaluates a method for rating the surface condition of forest roads and adapts it to the forest road network. The study finds that the condition ratings of forest roads differ from commonly used indices. Linear regression analysis identifies effective parameters for numerical assessment of road conditions.
Forest road pavement needs an evaluation methodology based on a comprehensive assessment of road conditions. This research was conducted to evaluate the performance of a method for rating the surface condition of forest roads and eventually to adapt the method to the situation prevailing in a forest road network. The rating method selected as the basis for this experiment was the pavement condition index (PCI) developed by the U.S. Army Corps of Engineers for urban roads. In addition, unpaved road condition index (URCI) that has a good index for unpaved road evaluation used for comparison. A 53 km of forest roads were selected containing the most influential factors and variability of conditions. Eventually, 201 road segments were delineated between 150-300 m in length. Within the given segments, sample plots were set 20 m in length consecutively. It was concluded that the panel scores for distress and surface condition of sample unit and section differed from the forest road pavement condition index (FRPCI), URCI, and PCI. Linear regression was used to derive equations between distress and URCI and PCI scores to determine effective FRPCI parameters that provide a numerical rating for the condition of road segments within the road network, where 0 worlds are the worst possible condition, and 100 is the best possible condition best. In addition, regression analysis showed that the FRPCI model with a 0.77 correlation for the total of the road is a performance index used for the first time in forest roads. This study showed a range of FRPCI from 7.8 to 96.3, different from PCI and URCI ratings (0.85-45 and 1.2-53). The FRPCI index helps forest managers in road maintenance, harvesting, and planning to use road information.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available