Related references
Note: Only part of the references are listed.Generation of stacking plans for prefabricated exterior wall panels shipped vertically with A-frames
Yujin Lee et al.
AUTOMATION IN CONSTRUCTION (2021)
Empirical Study of Identifying Logistical Problems in Prefabricated Interior Wall Panel Construction
Yujin Lee et al.
JOURNAL OF MANAGEMENT IN ENGINEERING (2021)
Sources of Uncertainties in Offsite Logistics of Modular Construction for High-Rise Building Projects
Yi Yang et al.
JOURNAL OF MANAGEMENT IN ENGINEERING (2021)
Schedule Delay Leading Indicators in Precast Concrete Construction Projects: Qualitative Comparative Analysis of Korean Cases
Kyeongwoon Cho et al.
JOURNAL OF MANAGEMENT IN ENGINEERING (2021)
Blockchain-based framework for improving supply chain traceability and information sharing in precast construction
Zhaojing Wang et al.
AUTOMATION IN CONSTRUCTION (2020)
Supply Chain Management for Prefabricated Building Projects in Hong Kong
Lizi Luo et al.
JOURNAL OF MANAGEMENT IN ENGINEERING (2020)
Dynamic transportation planning for prefabricated component supply chain
Hong Zhang et al.
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2020)
Sustainable Ship Loading Planning for Prefabricated Products in the Construction Industry
Wen Yi et al.
SUSTAINABILITY (2020)
Cloud-based fleet management for prefabrication transportation
Gangyan Xu et al.
ENTERPRISE INFORMATION SYSTEMS (2019)
Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong
Lizi Luo et al.
JOURNAL OF MANAGEMENT IN ENGINEERING (2019)
Genetic algorithm for determining the construction logistics of precast components
Yuan Fang et al.
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2019)
Applying the Bi-Level Programming Model Based on Time Satisfaction to Optimize Transportation Scheduling of Prefabricated Components
Xiaoya Tang et al.
PROCEEDINGS OF 2019 8TH INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT (ICITM 2019) (2019)
Optimal logistics planning for modular construction using two-stage stochastic programming
Pei-Yuan Hsu et al.
AUTOMATION IN CONSTRUCTION (2018)
Assessing and Prioritising Delay Factors of Prefabricated Concrete Building Projects in China
Yingbo Ji et al.
APPLIED SCIENCES-BASEL (2018)
Dynamic loading on a prefabricated modular unit of a building during road transportation
Siddhesh Godbole et al.
JOURNAL OF BUILDING ENGINEERING (2018)
Improved Precast Production-Scheduling Model Considering the Whole Supply Chain
Zhaojing Wang et al.
JOURNAL OF COMPUTING IN CIVIL ENGINEERING (2017)
Panel Stacking, Panel Sequencing, and Stack Locating in Residential Construction: Lean Approach
John P. Shewchuk et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2012)
Developing a precast production management system using RFID technology
Samuel Y. L. Yin et al.
AUTOMATION IN CONSTRUCTION (2009)
Formalization of the flow of component-related information in precast concrete supply chains
Esin Ergen et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2008)
Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS
Esin Ergen et al.
AUTOMATION IN CONSTRUCTION (2007)