4.5 Article

Research on Power System Dispatching Operation under High Proportion of Wind Power Consumption

Journal

ENERGIES
Volume 15, Issue 18, Pages -

Publisher

MDPI
DOI: 10.3390/en15186819

Keywords

dynamic programming; penalty function; high proportion of wind power consumption; combined operation of wind power; thermal power; pumped-storage power station

Categories

Funding

  1. Natural Science Foundation of China [52179016]
  2. Natural Science Foundation of Hubei Province [2021CFB597]

Ask authors/readers for more resources

This paper establishes an optimal dispatch model for a multi-energy power system consisting of thermal power, wind power, and a pumped-storage power station. The model improves the traditional dynamic programming method by introducing penalty function and dynamic value of the state variable, ensuring power supply reliability and optimizing energy utilization. The model solves the challenges of a high proportion of wind power systems with a pumped-storage power station and relevant constraints, resulting in a flexible operation of the power grid.
For the multi-energy power system composed of thermal power, wind power, and a pumped-storage power station aiming at minimizing coal consumption of the power grid, an optimal dispatch model is established in this paper. Its advantage is to allow the power grid to accept a high proportion of new energy while ensuring power demand. The dynamic programming method is used to solve the problem. In the solution process, the traditional dynamic programming method is improved by introducing the penalty function and the dynamic value of the state variable, which can ensure the reliability of the power supply while achieving the optimization goal, as well as realize the full utilization of energy. Using the example of a high proportion of wind power systems with a pumped-storage power station as the energy storage mode and considering the relevant constraints after the heating transformation of the thermal power plant, our built model solves these challenges. The results show that when the maximum pumping power of the pumped-storage power station reaches 1138 MW and the maximum generating power reaches 755 MW, the wind curtailment and power rationing during the off-peak period of heating can be reduced from the previous 58,158 MWH and 46,838 MWH to almost 0, and the wind curtailment and power rationing during the peak period of heating can be reduced from the previous 77,656 MWH and 53,780 MWH to almost 0, so as to realize the flexible operation of the power grid.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available