4.4 Article

Combining simulation and optimization to derive operating policies for a concentrating solar power plant

Journal

OR SPECTRUM
Volume 45, Issue 1, Pages 119-150

Publisher

SPRINGER
DOI: 10.1007/s00291-022-00688-7

Keywords

Optimized dispatch; Maintenance simulation; Monte Carlo; Concentrating solar power (CSP)

Ask authors/readers for more resources

This study presents a method that combines an offline optimization model with a simulation procedure to determine the profitability of different operating strategies. The feedback from the simulation model is used in a parametric analysis to obtain penalties for short-term operations scheduling and maximize long-term revenues.
Optimizing short-term decisions over a rolling horizon and/or using deterministic penalties to capture system stochasticity can lead to myopic policies that fail to consider unplanned events and their long-term adverse effects. We present a methodology that integrates an off-line optimization model with a simulation procedure to determine the profitability of different operating strategies; specifically, the latter is used to generate additional constraints for the former when failures occur according to system component operating lifetimes that (i) are subject to exogenous uncertainty, and (ii) may degrade more quickly under specific operating conditions. We use the feedback provided by the simulation model in a parametric analysis to obtain penalties that can be used in short-term operations scheduling to maximize the long-term revenues obtained by the optimization model. We apply this research to a concentrating solar power plant; our results show that the methodology can be used to choose an operating policy that balances maximizing profit while accounting for maintenance costs. Integrating the optimization model with a simulation procedure reveals that aggressive prices for cycling yield about 55% fewer startups and 30% fewer failures compared to using a more typical start-up operating strategy, and can save hundreds of thousands to millions of dollars in repair costs over the lifetime of the plant.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.4
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available