4.7 Article

Probabilistic electrical load forecasting for buildings using Bayesian deep neural networks

Journal

JOURNAL OF BUILDING ENGINEERING
Volume 46, Issue -, Pages -

Publisher

ELSEVIER
DOI: 10.1016/j.jobe.2021.103853

Keywords

Building electrical load forecasting; Model uncertainty; Bayesian deep neural network; Long short-term memory network; Dropout

Funding

  1. National Natural Science Foundation of China [51908365]

Ask authors/readers for more resources

This study presents three Bayesian deep neural network models for probabilistic building electrical load forecasting. The models utilize deep neural networks and the dropout technique to quantify model uncertainties. Experimental results show that all three models perform satisfactorily, with the Bayesian LSTM model achieving the best performance and satisfactory load forecasting accuracy with only 10-hour lagged electrical loads.
Deep learning techniques are increasingly applied in building electrical load analysis thanks to the enrichment of information-intensive sensory data. However, uncertainty is seldom considered among existing deep learning models. This study proposes three Bayesian deep neural network models for probabilistic building electrical load forecasting. Three prevalent deep neural networks (recurrent neural network (RNN), long short-term memory (LSTM), and gated recurrent unit (GRU)) are utilized for model development. In each model, the dropout technique is implemented as a variational Bayesian approximation to quantify two types of model uncertainties: aleatoric and epistemic uncertainty. Performances of the proposed models are evaluated using real data. The results showed that all the proposed three models achieved satisfactory performances and the Bayesian LSTM (BLSTM) model achieved the best performance with up to 15.4% mean absolute percentage error reduction than the baseline model. It was also found that the weather variables were not necessary inputs for Bayesian deep neural network models. The impacts of the input time lags and forecasting horizons on load forecasting accuracies were also investigated. It was found that the BLSTM model could derive decent model performances with only 10 h lagged electrical loads and achieve satisfactory accuracies for the 1-day ahead load forecasting.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available