Probabilistic multi-objective optimum combined inspection and monitoring planning and decision making with updating

Journal

STRUCTURE AND INFRASTRUCTURE ENGINEERING
Volume 18, Issue 10-11, Pages 1487-1505

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/15732479.2022.2061015

Keywords

Decision making; inspection; life-cycle cost; maintenance; monitoring; multi-objective optimization; probability; service life; updating

Funding

  1. National Science Foundation (NSF) [CMMI-1537926]
  2. Commonwealth of Pennsylvania, Department of Community and Economic Development, through the Pennsylvania Infrastructure Technology Alliance (PITA)
  3. National Research Foundation of Korea (NRF), Ministry of Science and ICT of Korean government [NRF-2018R1C1B5044084]

Ask authors/readers for more resources

This paper presents a novel probabilistic approach for optimum combined inspection and monitoring planning. By updating the parameters, the optimum planning can be achieved. The results demonstrate that the best inspection and monitoring application time, as well as monitoring duration, can be obtained through the decision-making process and the selection of Pareto front.
This paper presents a novel probabilistic approach for optimum combined inspection and monitoring planning (CIMP) with updating. This optimum planning is based on five objectives considering life-cycle cost, extended service life, maintenance delay, damage detection delay, and time-based probability of failure. The five-objective optimization provides a Pareto front. Through decision making process, the best solution is selected from the Pareto front. This solution indicates the optimum inspection application time, monitoring application time, and monitoring duration. When the information related to the damage propagation model is obtained from inspection and monitoring, the probabilistic parameters related to damage propagation prediction are updated. Using the updated damage propagation, the objective function is re-formulated and CIMP is re-optimized. The Pareto fronts associated with inspection planning, monitoring planning, and CIMP are compared when the multi-objective optimizations include or exclude the expected monetary loss due to structural failure. The effects of the weights of objectives and the expected monetary loss on the optimum CIMP are investigated. Furthermore, the parameters and damage propagation updated with the information from inspection and monitoring are compared. The proposed approach is applied to an existing fatigue-sensitive steel bridge.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available