4.4 Article

A robust standard deviation control chart based on square A estimator

Journal

QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL
Volume 38, Issue 5, Pages 2715-2730

Publisher

WILEY
DOI: 10.1002/qre.3100

Keywords

average run length; expected average run length; mean squared error; square A estimator

Ask authors/readers for more resources

This study proposes two types of square A estimators based on different screenings and compares their mean squared errors with existing estimators under different disturbances. The results show that the proposed estimators perform the best against disturbances and are closer to the normal cases.
The estimates of a standard deviation deteriorate the detection ability of control charts by reason of its high biases when the contaminations are present. This study proposes two kinds of square A estimators based on different screenings and compares the values of their mean squared error with those of existing estimators in diffuse and localized disturbances. The effectiveness of Phase II control charts is evaluated when the estimators are contaminated in Phase I using two kinds of disturbances. The proposed estimators perform the best against disturbances, with their average run lengths and expected average run lengths being closer to those in normal cases compared to other estimators.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.4
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available