4.7 Article

Bi-objective resource-constrained project scheduling problem with time-dependent resource costs

Related references

Note: Only part of the references are listed.
Article Management

Scheduling activities with time-dependent durations and resource consumptions

Steffen Pottel et al.

Summary: This paper studies the problem of scheduling a sequence of activities with limited resources. A dynamic discretization discovery algorithm is proposed to optimize the scheduling policies, and it is applied to the route evaluation of an electric vehicle fleet.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2022)

Review Management

An updated survey of variants and extensions of the resource-constrained project scheduling problem *

Sonke Hartmann et al.

Summary: The paper provides an overview of the resource-constrained project scheduling problem and its various extensions, focusing on the research trends and latest developments of the past decade.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2022)

Article Engineering, Industrial

A bi-objective robust resource allocation model for the RCPSP considering resource transfer costs

Jianjiang Wang et al.

Summary: The study proposed a bi-objective optimization model to address resource allocation issues in project scheduling, aiming to minimize transfer costs and maximize solution robustness. Using a novel resource-oriented flow formulation, NSGA-II and PSA algorithms were applied as solution methodologies, and the effectiveness was evaluated through benchmark tests.

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2021)

Article Engineering, Industrial

A robust customer order scheduling problem along with scenario-dependent component processing times and due dates

Chin-Chia Wu et al.

Summary: This study focuses on the customer's order scheduling problem on m parallel machines, taking into account uncertainty factors in real production. It introduces scenario-dependent processing times and due dates, aiming to minimize total tardiness across possible scenarios. Several dominant rules, lower bounds, heuristics, and algorithms are proposed for exact and approximate solutions, with computational results reported.

JOURNAL OF MANUFACTURING SYSTEMS (2021)

Review Engineering, Industrial

Smart manufacturing scheduling: A literature review

Julio C. Serrano-Ruiz et al.

Summary: This paper explores the application of digital twin technology and the zero-defect manufacturing model in automatic and autonomous scheduling management, identifying three methodological trends and main alignment axes, providing a map for classifying relevant literature, and discussing key findings and research gaps.

JOURNAL OF MANUFACTURING SYSTEMS (2021)

Review Management

Performance indicators in multiobjective optimization

Charles Audet et al.

Summary: In recent years, there has been significant growth in the development of new algorithms for multiobjective optimization, with a large number of performance indicators introduced to measure the quality of Pareto front approximations. A total of 63 performance indicators are reviewed in this work, categorized into four groups based on their properties: cardinality, convergence, distribution, and spread. Applications of these indicators are also presented.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2021)

Review Management

A survey of hybrid metaheuristics for the resource-constrained project scheduling problem

Robert Pellerin et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2020)

Article Engineering, Industrial

Multiobjective scheduling algorithm for flexible manufacturing systems with Petri nets

Gonzalo Mejia et al.

JOURNAL OF MANUFACTURING SYSTEMS (2020)

Article Computer Science, Interdisciplinary Applications

An effective mirror-based genetic algorithm for scheduling multi-mode resource constrained projects

Reza Zamani

COMPUTERS & INDUSTRIAL ENGINEERING (2019)

Article Computer Science, Interdisciplinary Applications

A Path-Relinking algorithm for the multi-mode resource-constrained project scheduling problem

Albert Einstein Fernandes Muritiba et al.

COMPUTERS & OPERATIONS RESEARCH (2018)

Article Engineering, Industrial

Integrating financial planning, loaning strategies and project scheduling on a discrete-time model

Pedro Martins

JOURNAL OF MANUFACTURING SYSTEMS (2017)

Article Computer Science, Artificial Intelligence

A New Dominance Relation-Based Evolutionary Algorithm for Many-Objective Optimization

Yuan Yuan et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2016)

Article Computer Science, Artificial Intelligence

Balancing Convergence and Diversity in Decomposition-Based Many-Objective Optimizers

Yuan Yuan et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2016)

Proceedings Paper Automation & Control Systems

An exact method to solve a Bi-objective Resource Constraint Project Scheduling Problem

Xixi Wan et al.

IFAC PAPERSONLINE (2016)

Article Management

A novel multi-objective particle swarm optimization with multiple search strategies

Qiuzhen Lin et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2015)

Article Computer Science, Artificial Intelligence

A multi-agent optimization algorithm for resource constrained project scheduling problem

Xiao-long Zheng et al.

EXPERT SYSTEMS WITH APPLICATIONS (2015)

Article Computer Science, Interdisciplinary Applications

A Criterion Space Search Algorithm for Biobjective Integer Programming: The Balanced Box Method

Natashia Boland et al.

INFORMS JOURNAL ON COMPUTING (2015)

Article Computer Science, Interdisciplinary Applications

A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations

Elham Nabipoor Afruzi et al.

COMPUTERS & OPERATIONS RESEARCH (2014)

Article Green & Sustainable Science & Technology

An investigation into minimising total energy consumption and total weighted tardiness in job shops

Ying Liu et al.

JOURNAL OF CLEANER PRODUCTION (2014)

Article Multidisciplinary Sciences

Multiobjective Resource-Constrained Project Scheduling with a Time-Varying Number of Tasks

Manuel Blanco Abello et al.

SCIENTIFIC WORLD JOURNAL (2014)

Article Management

Sustainable workforce scheduling in construction program management

L. Florez et al.

JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY (2013)

Article Computer Science, Interdisciplinary Applications

An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs

Joseph G. Szmerekovsky et al.

COMPUTERS & OPERATIONS RESEARCH (2012)

Article Computer Science, Interdisciplinary Applications

An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem

Chen Fang et al.

COMPUTERS & OPERATIONS RESEARCH (2012)

Article Computer Science, Interdisciplinary Applications

jMetal: A Java framework for multi-objective optimization

Juan J. Durillo et al.

ADVANCES IN ENGINEERING SOFTWARE (2011)

Article Mathematics, Applied

DIRECT MULTISEARCH FOR MULTIOBJECTIVE OPTIMIZATION

A. L. Custodio et al.

SIAM JOURNAL ON OPTIMIZATION (2011)

Review Management

A survey of variants and extensions of the resource-constrained project scheduling problem

Soenke Hartmann et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2010)

Article Engineering, Industrial

A bi-objective model for robust resource-constrained project scheduling

MA Al-Fawzan et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2005)

Article Management

Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms

J Alcaraz et al.

JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY (2003)

Review Computer Science, Artificial Intelligence

Performance assessment of multiobjective optimizers: An analysis and review

E Zitzler et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2003)

Article Computer Science, Artificial Intelligence

A fast and elitist multiobjective genetic algorithm: NSGA-II

K Deb et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2002)

Article Operations Research & Management Science

Project scheduling under time dependent costs - A branch and bound algorithm

NR Achuthan et al.

ANNALS OF OPERATIONS RESEARCH (2001)

Article Operations Research & Management Science

Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows

G Ulusoy et al.

ANNALS OF OPERATIONS RESEARCH (2001)

Article Operations Research & Management Science

A robust genetic algorithm for resource allocation in project scheduling

J Alcaraz et al.

ANNALS OF OPERATIONS RESEARCH (2001)

Article Computer Science, Artificial Intelligence

Comparison of Multiobjective Evolutionary Algorithms: Empirical Results

Eckart Zitzler et al.

EVOLUTIONARY COMPUTATION (2000)