Related references
Note: Only part of the references are listed.Expected shortfall for the makespan in activity networks under imperfect information
Carlo Meloni et al.
FLEXIBLE SERVICES AND MANUFACTURING JOURNAL (2020)
A framework for dynamic rescheduling problems
Rune Larsen et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2019)
Minimizing conditional-value-at-risk for stochastic scheduling problems
Subhash C. Sarin et al.
JOURNAL OF SCHEDULING (2014)
On the fallacy of averages in project risk management
SE Elmaghraby
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2005)
Shortfall as a risk measure: properties, optimization and applications
D Bertsimas et al.
JOURNAL OF ECONOMIC DYNAMICS & CONTROL (2004)
Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
D Dubois et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2003)
On latest starting times and floats in activity networks with ill-known durations
D Dubois et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2003)