4.8 Article

Expected Shortfall for the Makespan in Activity Networks With Fuzzy Durations

Related references

Note: Only part of the references are listed.
Article Engineering, Industrial

Expected shortfall for the makespan in activity networks under imperfect information

Carlo Meloni et al.

FLEXIBLE SERVICES AND MANUFACTURING JOURNAL (2020)

Article Engineering, Industrial

A framework for dynamic rescheduling problems

Rune Larsen et al.

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2019)

Article Engineering, Manufacturing

Minimizing conditional-value-at-risk for stochastic scheduling problems

Subhash C. Sarin et al.

JOURNAL OF SCHEDULING (2014)

Article Management

On the fallacy of averages in project risk management

SE Elmaghraby

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2005)

Article Economics

Shortfall as a risk measure: properties, optimization and applications

D Bertsimas et al.

JOURNAL OF ECONOMIC DYNAMICS & CONTROL (2004)

Article Management

Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge

D Dubois et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2003)

Article Management

On latest starting times and floats in activity networks with ill-known durations

D Dubois et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2003)