Robust long-term aircraft heavy maintenance check scheduling optimization under uncertainty

Journal

COMPUTERS & OPERATIONS RESEARCH
Volume 141, Issue -, Pages -

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cor.2021.105667

Keywords

Scheduling; Min-max optimization; Genetic algorithm; Robustness optimization; Aircraft maintenance

Ask authors/readers for more resources

This paper applies a genetic algorithm to generate robust and efficient aircraft heavy maintenance check schedules, reducing workload and the need for frequent adjustments while considering uncertainties. A case study of a major European airline shows that the algorithm can find suitable maintenance schedules for a fleet of 45 aircraft in a short amount of time, reducing the total number of checks and increasing utilization.
Long-term heavy maintenance check schedules are crucial in the aviation industry since airlines need them to prepare the required maintenance tools, workforce, and aircraft spare parts. However, most airlines adopt a manual approach to plan the heavy maintenance check schedules in current practice. This manual process relies on the experience of their maintenance planners, and the resulting heavy maintenance schedules need frequent adjustment because of uncertainty. This paper applies a genetic algorithm (GA) to generate robust aircraft heavy maintenance check schedules. It aims to reduce the workload and the frequency of revising heavy maintenance schedules considering uncertainties associated with heavy maintenance check duration and aircraft daily utilization. A major European airline case study shows that the GA finds robust and efficient multi-year aircraft heavy maintenance schedules for a fleet of 45 aircraft in 30 min. Compared with the current approach followed by the airline, the algorithm reduces the total number of heavy maintenance checks by 7% while increasing utilization by 4.4%, which could potentially lead to a reduction of direct annual maintenance costs between $122.5K and $612.5K. Furthermore, when testing the robustness of the 4-years maintenance check schedules produced, a Monte Carlo analysis has shown that all aircraft could be maintained before their check due date for 41% of the episodes simulated, compared to 0.27% of the episodes for the single deterministic scenario approach.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available