3.8 Article

A two-stage assembly flow-shop scheduling problem with bi-level products structure and machines' availability constraints

Related references

Note: Only part of the references are listed.
Article Engineering, Industrial

Logistics distribution scheduling model of supply chain based on genetic algorithm

Yuan Zhang

Summary: This study aims to improve the efficiency of logistics distribution scheduling in the supply chain and reduce costs, using a genetic algorithm-based method to solve vehicle scheduling problems. The method effectively reduces distribution costs, has higher computing speed, and provides a new approach for the study of logistics distribution scheduling models.

JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING (2022)

Article Engineering, Multidisciplinary

Metaheuristics for two-stage flow-shop assembly problem with a truncation learning function

Chin-Chia Wu et al.

Summary: This study presents a model for a two-stage three-machine flow-shop assembly scheduling problem with a truncation learning function, and utilizes various algorithms for solving it, with results validating the performance of the algorithms.

ENGINEERING OPTIMIZATION (2021)

Article Computer Science, Interdisciplinary Applications

Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines

Zikai Zhang et al.

Summary: This paper addresses the integration of preventive maintenance activities into two-stage assembly flow shop scheduling with dedicated machines. Various methods including mixed integer linear programming model, heuristics, and an iterated greedy algorithm were utilized, with the iterated greedy algorithm showing the best results among all benchmark instances.

COMPUTERS & INDUSTRIAL ENGINEERING (2021)

Article Engineering, Industrial

Cooperated teaching-learning-based optimisation for distributed two-stage assembly flow shop scheduling

Deming Lei et al.

Summary: The paper proposes a cooperative teaching-learning-based optimization algorithm to solve the distributed two-stage assembly flow shop scheduling problem, which achieves competitive performances through constructing multiple classes, class cooperation, and multi-stage search.

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2021)

Article Computer Science, Interdisciplinary Applications

New efficient constructive heuristics for the two-stage multi-machine assembly scheduling problem

Carla Talens et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2020)

Article Computer Science, Artificial Intelligence

Solving the two-stage hybrid flow shop scheduling problem based on mutant firefly algorithm

Beibei Fan et al.

JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING (2019)

Article Engineering, Industrial

A two-stage three-machine assembly scheduling problem with deterioration effect

Chin-Chia Wu et al.

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2019)

Article Computer Science, Interdisciplinary Applications

A two-stage three-machine assembly scheduling flowshop problem with both two-agent and learning phenomenon

Chin-Chia Wu et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2019)

Article Computer Science, Interdisciplinary Applications

Minimizing total completion time in the assembly scheduling problem

Ik Sun Lee

COMPUTERS & INDUSTRIAL ENGINEERING (2018)

Article Computer Science, Interdisciplinary Applications

Multi objective two-stage assembly flow shop with release time

Shaya Sheikh et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2018)

Article Computer Science, Interdisciplinary Applications

Bi-level genetic algorithms for a two-stage assembly flow-shop scheduling problem with batch delivery system

Saeedeh Ahmadi Basir et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2018)

Article Computer Science, Interdisciplinary Applications

Two-stage assembly scheduling problem for processing products with dynamic component-sizes and a setup time

Sunwoong Jung et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2017)

Article Computer Science, Interdisciplinary Applications

An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations

O. Kheirandish et al.

INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING (2015)

Article Engineering, Industrial

Resequencing orders on mixed-model assembly lines: Heuristic approaches to minimise the number of overload situations

Christian Franz et al.

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2014)

Article Automation & Control Systems

Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times

Sara Hatami et al.

INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2010)

Article Computer Science, Interdisciplinary Applications

Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan

Fawaz S. Al-Anzi et al.

COMPUTERS & OPERATIONS RESEARCH (2009)

Article Management

General variable neighborhood search for the continuous optimization

Nenad Mladenovic et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)

Article Automation & Control Systems

The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time

Ali Allahverdi et al.

INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2008)

Article Computer Science, Interdisciplinary Applications

Considering scheduling and preventive maintenance in the flowshop sequencing problem

Ruben Ruiz et al.

COMPUTERS & OPERATIONS RESEARCH (2007)