☆
3.8
Article
A two-stage assembly flow-shop scheduling problem with bi-level products structure and machines' availability constraints
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING (2022)
Rate this paper
The primary rating indicates the level of overall quality for the paper. Secondary ratings independently reflect strengths or weaknesses of the paper.
Discover Peeref hubs
Discuss science. Find collaborators. Network.
Join a conversationAsk a Question. Answer a Question.
Quickly pose questions to the entire community. Debate answers and get clarity on the most important issues facing researchers.
Get Started