4.6 Article

Techno-economic analysis of excess heat driven post-combustion CCS at an oil refinery

Journal

INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL
Volume 45, Issue -, Pages 130-138

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.ijggc.2015.12.019

Keywords

Refinery; Carbon capture; MEA; Process integration; Techno-economic analysis

Funding

  1. Energy Systems Programme
  2. Swedish Energy Agency
  3. Preem AB

Ask authors/readers for more resources

Carbon capture and storage may, as a bridging technology, rapidly decrease CO2 emissions in the industrial sector. In this paper, a techno-economic study of a future MEA carbon capture plant implemented at a case study oil refinery is presented. Costs are calculated for six setups of carbon capture at the refinery. Excess heat from the refinery processes is used in the capture plant for regeneration of the absorption fluid, and the stripper reboiler temperature is varied to increase the extractable of excess heat. Supplementary heating is carried out with a heat pump. The number of chimneys to be included in the capture process is also varied, resulting in different CO2 concentrations and amounts of CO2 at the inlet of the capture plant. Results show that the specific cost for carbon capture increases as the amount of captured carbon increases due to the need for heat pumps. The costs are in the range of 41-57(sic)/t for the low-temperature cases (T-Reb =90 degrees C) and 39-44(sic)/t for the high-temperature cases (T-Reb = 120 degrees C). (C) 2015 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available