Sustainable Project Management: Reducing the Risk of Cost Inaccuracy Using a PLS-SEM Approach

Journal

SUSTAINABILITY
Volume 14, Issue 2, Pages -

Publisher

MDPI
DOI: 10.3390/su14020960

Keywords

cost overrun; PLS-SEM; project management; sustainability; Norway

Ask authors/readers for more resources

This study investigates the factors affecting the cost performance of large-scale road projects in Norway. The results show that factors such as local wishes, defective estimations, and long processing times have the most impact on cost increases during the planning phase, while scope changes, market conditions, and unforeseen ground conditions are the most influential parameters in the construction phase. External related factors also play a significant role in cost overrun during the construction phase.
Determining the factors leading to cost inaccuracy in infrastructure projects relates to sustainability by improving the cost performance of the projects (economic sustainability) and reducing the waste of available resources (environmental sustainability). This study investigates the effects of various factors affecting the cost performance of large-scale road projects in Norway in both the planning and construction phases. To this aim, a quantitative approach using a questionnaire survey was employed to understand the attitude of practitioners towards various factors causing cost increases. An advanced multivariate statistical approach of Partial Least Square Structural Equation Modeling (PLS-SEM) and Relative Importance Index (RII) was utilized to analyze the questionnaire responses. The results of the RII analysis show that local wishes, defective estimations, and long processing times had the most impact on the cost increase during the planning phase. At the same time, scope changes, market conditions, and unforeseen ground conditions were the most influential parameters in the construction phase. Moreover, the results obtained from PLS-SEM reveal that external related factors had the most influence among the other grouped factors (i.e., pre-construction, project management and contractual relationship, contractor's site management, and external) on cost overrun during the construction phase. Increasing the knowledge of these factors will allow for developing relevant project management approaches targeted at improving economic and environmental sustainability within both the planning and construction phases.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available