4.5 Article

Fatigue reliability assessment and life-cycle cost analysis of roadway bridges equipped with weigh-in-motion systems

Journal

STRUCTURE AND INFRASTRUCTURE ENGINEERING
Volume 19, Issue 10, Pages 1317-1333

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/15732479.2021.2023589

Keywords

Fatigue; reliability; weigh in motion; life-cycle cost; bridges; probability of failure; measurement accuracy; traffic model

Ask authors/readers for more resources

The use of integrated weigh-in-motion (WIM) systems in steel bridges can reduce the uncertainties related to load modelling in fatigue safety assessment. The collected WIM data helps to improve the evaluation of fatigue failure probability, enabling optimal scheduling of repair and maintenance activities, leading to improved safety and economic savings.
The fatigue safety assessment of critical details in steel bridges is dominated by several uncertainties mainly related to load modelling. The use of integrated weigh-in-motion (WIM) systems in roadway bridges allows to collect all the necessary information for tracking actual traffic conditions. Based on WIM data, the uncertainty associated to the evaluation of the probability of fatigue failure is reduced, allowing the optimal scheduling of repair and maintenance activities and thus improving safety and economic savings. The paper presents a methodology for estimating fatigue life cycle cost (LCC) of roadway bridges equipped with a WIM system that considers uncertainties in measurement and modelling errors. The procedure allows the quantification of the economic gain enabled by WIM systems, useful in assessing the cost/accuracy trade-off for a given WIM system. It is found that the continuous use of a WIM system may improve the rate of decrease of the structural reliability index, compared with temporally limited use of WIM data. The periodic update of the reliability index and of the probability of failure based on WIM measurements results in a rather accurate estimation of the fatigue life cycle cost, which is crucial in identifying the payback time of the WIM system.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available