Related references
Note: Only part of the references are listed.The proactive and reactive resource-constrained project scheduling problem
Morteza Davari et al.
JOURNAL OF SCHEDULING (2019)
Order allocation and sequencing with variable degree of uncertainty in aircraft manufacturing
Marcello Urgo et al.
CIRP ANNALS-MANUFACTURING TECHNOLOGY (2018)
A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
Patricio Lamas et al.
JOURNAL OF SCHEDULING (2016)
Dynamic adjustment of dispatching rule parameters in flow shops with sequence-dependent set-up times
Jens Heger et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2016)
Flexible robotic manufacturing cell scheduling problem with multiple robots
Yujun Yang et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2016)
Makespan estimation of a production process affected by uncertainty: Application on MTO production of NC machine tools
Massimo Manzini et al.
JOURNAL OF MANUFACTURING SYSTEMS (2015)
Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
Stefan Creemers
JOURNAL OF SCHEDULING (2015)
A robust scheduling approach for a single machine to optimize a risk measure
Marcello Urgo et al.
2ND CIRP ROBUST MANUFACTURING CONFERENCE (ROMAC 2014) (2014)
Flow shop rescheduling under different types of disruption
Ketrina Katragjini et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2013)
A two-stage stochastic programming project scheduling approach to production planning
Arianna Alfieri et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2012)
Robust production control against propagation of disruptions
T. Tolio et al.
CIRP ANNALS-MANUFACTURING TECHNOLOGY (2011)
SPECIES-Co-evolution of products, processes and production systems
T. Tolio et al.
CIRP ANNALS-MANUFACTURING TECHNOLOGY (2010)
Robotic cells with stochastic processing times
H. Neil Geismar et al.
IIE TRANSACTIONS (2010)
Identical part production in cyclic robotic cells: Concepts, overview and open questions
Nadia Brauner
DISCRETE APPLIED MATHEMATICS (2008)
A hybrid simulated annealing for solving an extended model of dynamic cellular manufacturing system
N. Safaei et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)
Changeable manufacturing - Classification, design and operation
H. -P. Wiendahl et al.
CIRP ANNALS-MANUFACTURING TECHNOLOGY (2007)
Machine cell formation using a mathematical model and a genetic-algorithm-based heuristic
Fantahun M. Defersha et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2006)
Sequencing and scheduling in robotic cells: Recent developments
M Dawande et al.
JOURNAL OF SCHEDULING (2005)
The complexity of machine scheduling for stability with a single disrupted job
R Leus et al.
OPERATIONS RESEARCH LETTERS (2005)
Minimum makespan task sequencing with multiple shared resources
M Caramia et al.
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING (2004)
The construction of stable project baseline schedules
W Herroelen et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2004)
Rescheduling manufacturing systems: A framework of strategies, policies, and methods
GE Vieira et al.
JOURNAL OF SCHEDULING (2003)