4.4 Article

A Case Study on BIM Object-Based Earned Value and Process Management in Highway Construction

Journal

KSCE JOURNAL OF CIVIL ENGINEERING
Volume 26, Issue 2, Pages 522-538

Publisher

KOREAN SOCIETY OF CIVIL ENGINEERS-KSCE
DOI: 10.1007/s12205-021-1348-3

Keywords

BIM; WBS; CBS; Earned value management; Process management

Ask authors/readers for more resources

This paper focuses on information classification using Building Information Modeling (BIM) and presents object-based properties, 3D object creation standards, cost, and process information in the case of highway construction sites. Through BIM-based cost-process integration, an efficient construction management practice is proposed.
The detailed data including spatial concept is not transmitted in the detailed data including the spatial concept in the statement of internal construction sites, and the integrated management of cost and process is not carried out because the construction is carried out on the site with cost-oriented details. so doing a double task of generating the necessary work breakdown structure (WBS) and spatial concept detailed data. In order to solve these problems, in this paper, the classification of information using building information model (BIM) object-based properties, 3D object creation standards, cost, and process information are presented centering on the case of highway construction sites. In the future, BIM-based cost-process integration proposes an efficient construction management practice through management.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.4
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available