Related references
Note: Only part of the references are listed.Distributed job-shop rescheduling problem considering reconfigurability of machines: a self-adaptive hybrid equilibrium optimiser
M. Mahmoodjanloo et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2022)
Walking worker vs fixed worker assembly considering the impact of components exposure on assembly time and energy expenditure
Martina Calzavara et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2021)
A new hybrid particle swarm optimization and parallel variable neighborhood search algorithm for flexible job shop scheduling with assembly process
Parviz Fattahi et al.
ASSEMBLY AUTOMATION (2020)
Dynamic coordinated scheduling for supply chain under uncertain production time to empower smart production for Industry 3.5
Thitipong Jamrus et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2020)
Flexible job shop scheduling problem with reconfigurable machine tools: An improved differential evolution algorithm
Mehdi Mahmoodjanloo et al.
APPLIED SOFT COMPUTING (2020)
Industry 4.0: Smart Scheduling
Daniel Alejandro Rossit et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2019)
Schedule Instability in Automotive Production Networks: The Development of a network-oriented Resequencing Method
A. Moetz et al.
IFAC PAPERSONLINE (2019)
Simultaneous balancing, sequencing, and workstation planning for a mixed model manual assembly line using hybrid genetic algorithm
Fantahun M. Defersha et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2018)
Digital twin-based smart production management and control framework for the complex product assembly shop-floor
Cunbo Zhuang et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2018)
A stochastic programming model for resequencing buffer content optimisation in mixed-model assembly lines
Elif Elcin Gunay et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2017)
Sequential variable neighborhood descent variants: an empirical study on the traveling salesman problem
Anis Mjirda et al.
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH (2017)
Ant Colony Optimization for Simulated Dynamic Multi-Objective Railway Junction Rescheduling
Jayne Eaton et al.
IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS (2017)
Past, present and future of Industry 4.0-a systematic literature review and research agenda proposal
Yongxin Liao et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2017)
Benchmarking of tools for User eXperience analysis in Industry 4.0
Margherita Peruzzini et al.
27TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING, FAIM2017 (2017)
Learning Factory: The Path to Industry 4.0
Felipe Baena et al.
7TH CONFERENCE ON LEARNING FACTORIES (CLF 2017) (2017)
A Case Study on Implementation of Walking Worker Assembly Line to Improve Productivity and Utilisation of Resources in a Heavy Duty Manufacturing Industry
A. Deepak et al.
FME TRANSACTIONS (2017)
Variable neighborhood search: basics and variants
Pierre Hansen et al.
EURO JOURNAL ON COMPUTATIONAL OPTIMIZATION (2017)
A modified particle swarm optimisation algorithm to solve the part feeding problem at assembly lines
Masood Fathi et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2016)
Ergonomic improvement through job rotations in repetitive manual tasks in case of limited specialization and differentiated ergonomic requirements
F. Boenzi et al.
IFAC PAPERSONLINE (2016)
Dynamic resequencing at mixed-model assembly lines
Christian Franz et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2015)
Resequencing of mixed-model assembly lines: Survey and research agenda
Nils Boysen et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2012)
Sequencing mixed-model assembly lines by considering feeding lines
Parviz Fattahi et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2012)
Scheduling just-in-time part supply for mixed-model assembly lines
Nils Boysen et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2011)
Sequencing mixed-model assembly lines: Survey, classification and model critique
Nils Boysen et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2009)
An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness
B. Naderi et al.
EXPERT SYSTEMS WITH APPLICATIONS (2009)
RFID-based wireless manufacturing for walking-worker assembly islands with fixed-position layouts
George Q. Huang et al.
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING (2007)
A survey on problems and methods in generalized assembly line balancing
C Becker et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2006)
Comparison between fixed- and walking-worker assembly lines
Q Wang et al.
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE (2005)