4.5 Article

Prioritization of Contracting Methods for Water and Wastewater Projects Using the Fuzzy Analytic Hierarchy Process Method

Journal

ENERGIES
Volume 14, Issue 22, Pages -

Publisher

MDPI
DOI: 10.3390/en14227815

Keywords

fuzzy analytic hierarchy process; construction contract; water; wastewater; Iran

Categories

Ask authors/readers for more resources

This study prioritizes contracting methods for water and wastewater projects in Iran using the FAHP method, determining that the bilateral, cooperative, and trilateral contracting methods are most suitable. The study offers useful guidance for project firms in selecting the optimal contracting method.
This study uses the fuzzy analytical hierarchy process (FAHP) method to prioritize contracting methods to determine the most suitable contract option for water and wastewater projects (WWP). Content analysis, a two-round Delphi survey technique, and a series of validation and reliability tests helped establish the 18 key criteria for FAHP analysis. Consequently, data collected from experts through a pairwise comparison questionnaire form the basis for the inputs for the FAHP analysis. Consequently, the final weightings were derived for each of the key criteria and available contracting methods. The results indicate that the bilateral, cooperative, and trilateral contracting methods are the most suitable for WWP in Iran, with the highest weighting. The study provides useful guidance for the top management of project firms in selecting the optimal contracting method for their projects and offers significant contributions from theoretical and practical perspectives.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available