4.7 Article

Identification of Risk-Significant Components in Nuclear Power Plants to Reduce Cs-137 Radioactive Risk

Related references

Note: Only part of the references are listed.
Article Nuclear Science & Technology

Variability of plant risk due to variable operator allowable time for aggressive cooldown initiation

Man Cheol Kim et al.

NUCLEAR ENGINEERING AND TECHNOLOGY (2019)

Article Nuclear Science & Technology

Consistency issues in quantitative safety goals of nuclear power plants in Korea

Ji Suk Kim et al.

NUCLEAR ENGINEERING AND TECHNOLOGY (2019)

Article Nuclear Science & Technology

Multi-unit Level 1 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site

Dong-San Kim et al.

NUCLEAR ENGINEERING AND TECHNOLOGY (2018)

Article Nuclear Science & Technology

Multi-unit Level 2 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site

Jaehyun Cho et al.

NUCLEAR ENGINEERING AND TECHNOLOGY (2018)

Article Nuclear Science & Technology

Treatment of complementary events in constructing the linked Level 1 and Level 2 fault trees

Young G. Jo et al.

NUCLEAR ENGINEERING AND DESIGN (2009)