Related references
Note: Only part of the references are listed.Logic-based Benders decomposition for gantry crane scheduling with transferring position constraints in a rail-road container terminal
Peng Guo et al.
ENGINEERING OPTIMIZATION (2021)
Multi-product production routing problem by consideration of outsourcing and carbon emissions: particle swarm optimization
M. Salehi Sarbijan et al.
ENGINEERING OPTIMIZATION (2021)
A two-stage stochastic programming for single yard crane scheduling with uncertain release times of retrieval tasks
Feifeng Zheng et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2019)
Yard crane scheduling problem in a container terminal considering risk caused by uncertainty
Junliang He et al.
ADVANCED ENGINEERING INFORMATICS (2019)
Carbon-efficient deployment of electric rubber-tyred gantry cranes in container terminals with workload uncertainty
Dayong Yu et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2019)
Yard Crane Scheduling for container storage, retrieval, and relocation
Virgile Galle et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2018)
Two Yard Crane Scheduling With Dynamic Processing Time and Interference
Feifeng Zheng et al.
IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS (2018)
Branch-and-price approaches for the Multiperiod Technician Routing and Scheduling Problem
Emilio Zamorano et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2017)
Scheduling optimization of yard cranes with minimal energy consumption at container terminals
Mei Sha et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2017)
Optimal allocation of resources for yard crane network management to minimize carbon dioxide emissions
Yun Peng et al.
JOURNAL OF CLEANER PRODUCTION (2016)
Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption
Junliang He et al.
ADVANCED ENGINEERING INFORMATICS (2015)
A simulation optimization method for internal trucks sharing assignment among multiple container terminals
Junliang He et al.
ADVANCED ENGINEERING INFORMATICS (2013)
An Exact Algorithm for the Integrated Planning of Berth Allocation and Quay Crane Assignment
Ilaria Vacca et al.
TRANSPORTATION SCIENCE (2013)
A continuous time model for multiple yard crane scheduling with last minute job arrivals
Wenkai Li et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2012)
Effects of storage block layout and automated yard crane systems on the performance of seaport container terminals
Nils Kemme
OR SPECTRUM (2012)
Multiple yard cranes scheduling for loading operations in a container terminal
Lu Chen et al.
ENGINEERING OPTIMIZATION (2011)
A new method for assessing CO2-emissions from container terminals: a promising approach applied in Rotterdam
Harry Geerlings et al.
JOURNAL OF CLEANER PRODUCTION (2011)
Discrete time model and algorithms for container yard crane scheduling
Wenkai Li et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2009)