A measurement model of project control systems success for engineering and construction projects case study: contractor companies in Saudi's petroleum and chemical industry

Journal

Publisher

EMERALD GROUP PUBLISHING LTD
DOI: 10.1108/ECAM-11-2020-0924

Keywords

Project control systems; Project management; Contractors; Maturity; Engineering; Construction

Ask authors/readers for more resources

This study presents a new modeling approach to evaluate the success of PCS, identifying six critical elements for PCS success. The results were used to create a PCS Maturity Model and a PCS Success Index, helping project managers determine the maturity level of their PCS and improvement areas.
Purpose The purpose of this paper is to presents a new modeling approach that provides a measurement tool for evaluating the effectiveness of Project Control Systems (PCS) and the improvement of the project control capability as a part of an organization's project management processes. Design/methodology/approach This study used a project management maturity approach to develop a measurement model of PCS success. The key elements in this model have been identified using the Fuzzy Analytic Hierarchy Process (FAHP) method to analyze data from a case study involving contractor companies in Saudi's petroleum and chemical industry. Findings The results identified six critical elements for PCS success: (1) Change Management, (2) Earned Value, (3) Baselined Plan, (4) Resource Loaded, (5) Progress Method and (6) Governance Program. In addition, Project Forecasting and Corrective Action Verification were identified as the main areas where clients and contractors need to focus for the effective deployment of a PCS. Practical implications The results of this study were used to create a PCS Maturity Model (PCSMM) and a PCS Success Index (PCSSI). The value of this index can help project managers to identify the maturity level of their PCS and improvement areas that lead to enhanced project performance. Originality/value This research presents an alternative maturity model for PCS assessment that provides a practical tool to identify areas for improving the critical elements of PCS success. The study draws a clear distinction between overall project success and the success of the PCS.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available