4.7 Article

A novel mathematical programming model for multi-mode project portfolio selection and scheduling with flexible resources and due dates under interval-valued fuzzy random uncertainty

Related references

Note: Only part of the references are listed.
Article Management

Combining multiple criteria analysis, mathematical programming and Monte Carlo simulation to tackle uncertainty in Research and Development project portfolio selection: A case study from Greece

George Mavrotas et al.

Summary: The study proposes a method for selecting R&D project portfolios dealing with uncertainty in evaluation, using multicriteria analysis, mathematical programming, and Monte Carlo simulation. Through an iterative process, the final portfolio of R&D projects is gradually converged, addressing the uncertainty in expert evaluation.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2021)

Article Computer Science, Artificial Intelligence

A variable neighborhood search simheuristic for project portfolio selection under uncertainty

Javier Panadero et al.

JOURNAL OF HEURISTICS (2020)

Review Management

A survey of hybrid metaheuristics for the resource-constrained project scheduling problem

Robert Pellerin et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2020)

Article Operations Research & Management Science

Project portfolio selection and scheduling optimization based on risk measure: a conditional value at risk approach

Vijaya Dixit et al.

ANNALS OF OPERATIONS RESEARCH (2020)

Article Computer Science, Artificial Intelligence

Evaluating large, high-technology project portfolios using a novel interval-valued Pythagorean fuzzy set framework: An automated crane project case study

Vahid Mohagheghi et al.

EXPERT SYSTEMS WITH APPLICATIONS (2020)

Article Computer Science, Artificial Intelligence

D-WASPAS: Addressing Social Cognition in Uncertain Decision-Making with an Application to a Sustainable Project Portfolio Problem

Vahid Mohagheghi et al.

COGNITIVE COMPUTATION (2020)

Article Construction & Building Technology

Memetic algorithm for solving resource constrained project scheduling problems

Humyun Fuad Rahman et al.

AUTOMATION IN CONSTRUCTION (2020)

Article Computer Science, Artificial Intelligence

A hybrid project portfolio selection procedure with historical performance consideration

Xiaoxiong Zhang et al.

EXPERT SYSTEMS WITH APPLICATIONS (2020)

Review Computer Science, Artificial Intelligence

Project portfolio selection problems: Two decades review from 1999 to 2019

Vahid Mohagheghi et al.

JOURNAL OF INTELLIGENT & FUZZY SYSTEMS (2020)

Article Computer Science, Artificial Intelligence

A method to solve linear programming problem with interval type-2 fuzzy parameters

Pradip Kundu et al.

FUZZY OPTIMIZATION AND DECISION MAKING (2019)

Article Computer Science, Artificial Intelligence

Project portfolio selection and scheduling under a fuzzy environment

Xiaoxiong Zhang et al.

MEMETIC COMPUTING (2019)

Article Computer Science, Interdisciplinary Applications

A new project selection method using data envelopment analysis

Mehdi Toloo et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2019)

Article Construction & Building Technology

Project selection and scheduling for phase-able projects with interdependencies among phases

Ali Shafahi et al.

AUTOMATION IN CONSTRUCTION (2018)

Article Computer Science, Interdisciplinary Applications

A hybrid TLBO-TS algorithm for integrated selection and scheduling of projects

Manish Kumar et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2018)

Article Computer Science, Artificial Intelligence

R&D project evaluation and project portfolio selection by a new interval type-2 fuzzy optimization approach

V. Mohagheghi et al.

NEURAL COMPUTING & APPLICATIONS (2017)

Article Computer Science, Information Systems

Multi-period portfolio selection with dynamic risk/expected-return level under fuzzy random uncertainty

Bo Wang et al.

INFORMATION SCIENCES (2017)

Article Computer Science, Artificial Intelligence

A mathematical modeling approach for high and new technology-project portfolio selection under uncertain environments

Vahid Mohagheghi et al.

JOURNAL OF INTELLIGENT & FUZZY SYSTEMS (2017)

Article Management

Linear solution schemes for Mean-SemiVariance Project portfolio selection problems: An application in the oil and gas industry

Jorge A. Sefair et al.

OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE (2017)

Article Computer Science, Interdisciplinary Applications

Integrated resource management for simultaneous project selection and scheduling

Mohammad Shariatmadari et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2017)

Article Computer Science, Artificial Intelligence

Random fuzzy mean-absolute deviation models for portfolio optimization problem with hybrid uncertainty

Zhongfeng Qin

APPLIED SOFT COMPUTING (2017)

Article Operations Research & Management Science

An extended model for project portfolio selection with project divisibility and interdependency

Xingmei Li et al.

JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING (2016)

Article Computer Science, Artificial Intelligence

An interactive fuzzy programming approach for bi-objective straight and U-shaped assembly line balancing problem

M. H. Alavidoost et al.

APPLIED SOFT COMPUTING (2016)

Article Computer Science, Artificial Intelligence

Uncertain mean-variance and mean-semivariance models for optimal project selection and scheduling

Xiaoxia Huang et al.

KNOWLEDGE-BASED SYSTEMS (2016)

Article Operations Research & Management Science

Multiobjective project portfolio selection with fuzzy constraints

F. Perez et al.

ANNALS OF OPERATIONS RESEARCH (2016)

Proceedings Paper Engineering, Electrical & Electronic

Reinvestment Strategy-Based Project Portfolio Selection and Scheduling with Time-Dependent Budget Limit Considering Time Value of Capital

Baolong Wang et al.

PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ELECTRICAL AND INFORMATION TECHNOLOGIES FOR RAIL TRANSPORTATION: TRANSPORTATION (2016)

Article Operations Research & Management Science

Multi-criteria analysis of supply chain risk management using interval valued fuzzy TOPSIS

Kajal Chatterjee et al.

OPSEARCH (2016)

Article Computer Science, Interdisciplinary Applications

Modeling and solving the project selection and Scheduling

Ali Asghar Tofighian et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2015)

Article Management

Optimal selection of project portfolios using reinvestment strategy within a flexible time horizon

M. Jafarzadeh et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2015)

Article Computer Science, Interdisciplinary Applications

A credibility-constrained programming for reliable forward-reverse logistics network design under uncertainty and facility disruptions

S. M. Hatefi et al.

INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING (2015)

Article Computer Science, Information Systems

Solving multi-period project selection problems with fuzzy goal programming based on TOPSIS and a fuzzy preference relation

Kaveh Khalili-Damghani et al.

INFORMATION SCIENCES (2013)

Article Information Science & Library Science

Strategic alignment and value maximization for IT project portfolios

I. Robert Chiang et al.

INFORMATION TECHNOLOGY & MANAGEMENT (2013)

Article Construction & Building Technology

Multi-Objective Dynamic Construction Site Layout Planning in Fuzzy Random Environment

Jiuping Xu et al.

AUTOMATION IN CONSTRUCTION (2012)

Article Management

A methodology for selecting portfolios of projects with interactions and under uncertainty

Amir Hossein Ghapanchi et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2012)

Article Construction & Building Technology

Optimizing project selection and scheduling problems with time-dependent resource constraints

Shu-Shun Liu et al.

AUTOMATION IN CONSTRUCTION (2011)

Article Computer Science, Interdisciplinary Applications

An extended GRA method for MCDM with interval-valued triangular fuzzy assessments and unknown weights

Shi-fang Zhang et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2011)

Article Mathematics, Applied

Fuzzy R&D portfolio selection of interdependent projects

Rupak Bhattacharyya et al.

COMPUTERS & MATHEMATICS WITH APPLICATIONS (2011)

Article Computer Science, Theory & Methods

An interactive possibilistic programming approach for multiple objective supply chain master planning

S. A. Torabi et al.

FUZZY SETS AND SYSTEMS (2008)

Article Engineering, Industrial

Fuzzy scheduling of a build-to-order supply chain

Kudret Demirli et al.

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2008)

Article Computer Science, Theory & Methods

Computing efficient solutions to fuzzy multiple objective linear programming problems

XQ Li et al.

FUZZY SETS AND SYSTEMS (2006)

Article Computer Science, Artificial Intelligence

Expected value of fuzzy variable and fuzzy expected value models

BD Liu et al.

IEEE TRANSACTIONS ON FUZZY SYSTEMS (2002)