Related references
Note: Only part of the references are listed.Multi-objective optimization for repetitive scheduling under uncertainty
Tarek Salama et al.
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2019)
A classification and review of approaches and methods for modeling uncertainty in projects
Öncü Hazır et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2019)
Improved Critical Path Method with Trapezoidal Fuzzy Activity Durations
Changming Hu et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2018)
Improved Critical Path Method with Trapezoidal Fuzzy Activity Durations
Changming Hu et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2018)
Sensitivity analysis in PERT networks: Does activity duration distribution matter?
Miklos Hajdu et al.
AUTOMATION IN CONSTRUCTION (2016)
Optimized scheduling and buffering of repetitive construction projects under uncertainty
Ibrahim Bakry et al.
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT (2016)
Scenario-Based Proactive Robust Optimization for Critical-Chain Project Scheduling
Guofeng Ma et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2015)
Scenario-Based Proactive Robust Optimization for Critical-Chain Project Scheduling
Guofeng Ma et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2015)
Investigation of critical activities in a network with point-to-point relations
Orsolya Bokor et al.
CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS (2015)
Alternative Approach for Conducting Construction Management Research: Quasi-Experimentation
Wen Yi et al.
JOURNAL OF MANAGEMENT IN ENGINEERING (2014)
A new approach for project scheduling using fuzzy dependency structure matrix
Qian Shi et al.
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2012)
A new approach for solving fuzzy critical path problem using analysis of events
Abalfazl Zareei et al.
EXPERT SYSTEMS WITH APPLICATIONS (2011)
Fuzzy Repetitive Scheduling Method for Projects with Repeating Activities
Alexander Maravas et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2011)
Research Validation: Challenges and Opportunities in the Construction Domain
Gunnar Lucko et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2010)
Role of Simulation in Construction Engineering and Management
Simaan AbouRizk
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2010)
Developing a Traffic Closure Integrated Linear Schedule for Highway Rehabilitation Projects
Haribol Sharma et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2009)
Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method
Daniel Castro-Lacouture et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2009)
Float Types in Linear Schedule Analysis with Singularity Functions
Gunnar Lucko et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2009)
Critical path analysis with fuzzy activity times
Matthew J. Liberatore
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT (2008)
Productivity scheduling method compared to linear and repetitive project scheduling methods
Gunnar Lucko
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2008)
Past perfect: Historical antecedents of modern construction practices
James E. Diekmann
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2007)
Multiobjective linear programming model for scheduling linear repetitive projects
Pandelis G. Ipsilandis
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2007)
Survey of the construction industry relative to the use of CPM scheduling for construction projects
Patricia D. Galloway
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2006)
Project scheduling under uncertainty: Survey and research potentials
W Herroelen et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2005)
Fuzzy logic approach for activity delay analysis and schedule updating
AVO Oliveros et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2005)
Where do we stand with fuzzy project scheduling?
P Bonnal et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2004)
On the sure criticality of tasks in activity networks with imprecise durations
S Chanas et al.
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS (2002)
Optimizing resource utilization for repetitive construction projects
K El-Rayes et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2001)