4.8 Article

Techno-economic comparison of 100% renewable urea production processes

Journal

APPLIED ENERGY
Volume 284, Issue -, Pages -

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.apenergy.2020.116401

Keywords

Renewable urea; Methane-to-urea; Biomass-to-urea; Power-to-urea; Power-to-hydrogen; Solid-oxide electrolyzer

Funding

  1. China Scholarship Council, China
  2. University of Pisa, Italy
  3. Group of Industrial Process and Energy Systems Engineering at EPFL

Ask authors/readers for more resources

Urea has diverse applications but there is a growing need for green urea production. Biomass-to-urea has potential but faces challenges in achieving high carbon conversion rates. Integrated power- and biomass-to-urea processes show promise in enhancing carbon conversion efficiency up to 53%.
Urea is widely used in agriculture, industry, and food, while it is also a potential fuel. Large-scale urea production relies on fossil fuels, thus there is a strong need for green urea given the increasing penetration of renewable energy sources. A potential alternative is biomass-to-urea; however, it cannot fully convert the biomass carbon into urea. To achieve full carbon conversion, innovative integrated biomass- and power-to-urea processes are designed conceptually. The two green urea production processes are evaluated techno-economically and compared with state-of-the-art methane-to-urea. The results show that the methane-to-urea achieves a system efficiency of 58% (LHV), while biomass-to-urea only has 39% (LHV) with unconverted biomass carbon of up to 60%. The integrated power- and biomass-to-urea has outstanding heat integration performance which fixes all biomass carbon into urea, with an efficiency enhanced up to 53%. Due to the electricity demand, the levelized cost of the urea of integrated biomass- and power-to-urea is 15 - 38 and 58 - 87% points higher than those of the biomass-to-urea and methane-to-urea for the scale of 10 - 60 MWth urea production. The available annual hours and electricity price of renewable electricity have a significant impact on the levelized cost of the urea. When the available annual hours decrease from 7200 to 3600 with an electricity price of 73 $/MWh, the levelized cost of urea increases on average by 13% from 51 $/GJ with the plant capacity being 10 - 60 MWth urea. However, when electricity price is reduced from 73 $/MWh to 35 $/MWh with available annual hours of 3600, the levelized cost decreases on average by 15% from 59 $/GJ with the same plant capacity.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available