Long-term hydraulic and treatment performance of a 19-year old constructed stormwater wetland Finally-maturated or in need of maintenance?

Journal

ECOLOGICAL ENGINEERING
Volume 95, Issue -, Pages 73-82

Publisher

ELSEVIER
DOI: 10.1016/j.ecoleng.2016.06.031

Keywords

Urban stormwater; Constructed stormwater wetland; Long-term performance; Suspended solids; Nutrients; Metals; Pollutant removal

Funding

  1. Swedish Water and Wastewater Association

Ask authors/readers for more resources

Constructed stormwater wetlands (CSWs) are a commonly used measure for stormwater retention and quality treatment. However, although questions have been raised about the long-term performance of CSWs, only a few studies have targeted this issue and none have evaluated the performance of CSWs more than approximately 5-10 years old. Further, most studies have not examined the development of the long-term performance of CSWs but delivered a snapshot at a certain point of time. The present study investigated the performance of a 19-year-old CSW in Vaxjo, Sweden, treating stormwater from a 320-ha urban catchment. Besides removal of sediment from the CSW's forebay, no other maintenance had been conducted. However, regular inspections had been performed. The results of the present sampling campaign were compared to two existing datasets collected at the same CSW after three years of operation in 1997 and nine years of operation in 2003. The CSW was found to provide efficient peak flow reduction and, depending on the event characteristics, also volume reduction. It still treated stormwater effectively: removal of Cd, Cu, Pb, Zn, TSS and TP event mean concentrations were between 89 and 96%, whereas mean concentrations of TN were reduced by 59%. The load removal efficiencies were even higher. Comparative analysis of the three monitoring periods based on the load removal efficiency revealed that the CSW, despite the lack of maintenance, performed more efficiently and stably for most pollutants compared to when newly constructed. This underlines the importance of the establishment and maturation of constructed wetland systems. Overall, the results showed that CSWs are resilient systems, which if designed well and regularly inspected to prevent major issues, can work efficiently for at least two decades. (C) 2016 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available