4.4 Article

Overcoming barriers to direct current power: Lessons learned from four commercial building case studies

Journal

ENERGY EFFICIENCY
Volume 14, Issue 1, Pages -

Publisher

SPRINGER
DOI: 10.1007/s12053-020-09920-1

Keywords

Net zero energy building; Construction; Power systems; Direct current power; Commercial buildings; Qualitative research

Funding

  1. Energy Institute at Colorado State University

Ask authors/readers for more resources

In commercial buildings, the usage of DC power is increasing, and converting building electrical systems from AC to DC power can reduce energy waste. Successful implementation of DC power requires owner support, a motivated team, and addressing technological issues. Key factors for success include pre-construction processes such as financing, bidding, and contracting.
While distribution systems deliver power to buildings using alternating current (AC), the loads in commercial buildings have increasingly shifted to those using direct current (DC) power. In addition, on-site generation, such as rooftop solar (which provides a DC source of electricity), is becoming more common in commercial buildings. As a consequence, numerous DC-to-AC and AC-to-DC conversions occur in commercial buildings, each of which results in wasted energy. This makes converting building electrical systems from AC to DC power an attractive energy efficiency measure. In the present study, barriers and advantages of DC power in commercial buildings were examined by interviewing personnel who worked on four commercial construction projects in Colorado. The cases, two new construction and two retrofits, varied in their level of successful implementation. The participants included general contractors, facilities managers, engineers, and financial officers. Interviews were coded for statements about people, technology, and the construction process. The results revealed that successful implementation required an owner who championed the project, along with a team that demonstrated positive motivations (e.g., enjoying a challenge, accepting uncertainty). Technological issues faced by the projects were largely due to limited availability and incompatibility of DC parts. Finally, pre-construction processes (financing, bidding, and contracting) emerged as important differentiators between successful and unsuccessful projects. These findings provide a roadmap for increasing successful implementation of DC power in commercial construction projects.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.4
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available