Journal
SCIENCE OF THE TOTAL ENVIRONMENT
Volume 770, Issue -, Pages -Publisher
ELSEVIER
DOI: 10.1016/j.scitotenv.2020.144626
Keywords
Floodplain; River restoration; Hydrology; Geomorphology
Categories
Funding
- Rural and Environmental Science and Analytical Services (RESAS) division of the Scottish Government
- EU LIFE 'Pearls in Peril' project
- Dee Catchment Partnership
Ask authors/readers for more resources
Lowering flood embankments on the River Dee in Scotland improved hydrogeomorphic connectivity between the river channel and floodplain, resulting in channel aggradation, bank erosion, and gravel deposition. Monitoring showed that this targeted action increased floodplain water levels and decreased the threshold river discharge for backwater connection, enhancing future catchment resilience. Such interventions may benefit water storage and biogeochemical processing in the long term.
Floodplain reconnection can potentially improve the hydrogeomorphology of river corridors and attenuate flood peaks. However, empirical evidence of its effectiveness - needed to inform future restoration - is limited. A 70 m long flood embankment was lowered on the upper River Dee, a mediumsized gravel bed river in north-east Scotland to reconnect a backwater and floodplain. Comparison of two years pre- and three years of post-restoration hydro-geomorphic monitoring, shows the lowering and subsequent adjustment, assisted by several floods including a <1% annual exceedance probability event, have altered the morphology and hydrological dynamics. Channel aggradation of up to 1 m occurred. Erosion of the bank by up to 0.41 m in depth and deposition of gravel or sand within the backwater and the floodplain were the dominant geomorphic responses elsewhere. The channel adjustment, unexpected in the restoration design, improved hydrological connectivity with the floodplain; annual median water table levels were on average 0.037-0.089 m higher post-restoration although the correlation between river discharge and floodplain water levels did not change. Based on 1D modelling, the threshold river discharge for backwater connection decreased by 55% from 93 m(3) s(-1) (discharge exceedance percentile: Q(0.4)) to 42 m(3) s(-1) (Q8). Thus, overspill frequency increased. For a given peak discharge, floodplain water levels were higher on average by 0.25 m with a statistically significant difference (Mann Whitney U test: p < 0.05), due to improved hydrological connectivity. The monitoring demonstrates that localised but significant improvement of channel to floodplain hydro-geomorphic connectivity can result from targeted embankment lowering. Such actions could enhance future catchment resilience by improving water storage and biogeochemical processing. (C) 2021 Elsevier B.V. All rights reserved.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available