Related references
Note: Only part of the references are listed.Reliability and availability analysis of standby systems with working vacations and retrial of failed components
Dong-Yuh Yang et al.
RELIABILITY ENGINEERING & SYSTEM SAFETY (2019)
Sensitivity analysis of the machine repair problem with general repeated attempts
Dong-Yuh Yang et al.
INTERNATIONAL JOURNAL OF COMPUTER MATHEMATICS (2018)
Modeling of machine interference problem with unreliable repairman and standbys imperfect switchover
Jau-Chuan Ke et al.
RELIABILITY ENGINEERING & SYSTEM SAFETY (2018)
Group maintenance policies for an R-out-of-N system with phase-type distribution
Yonit Barron
ANNALS OF OPERATIONS RESEARCH (2018)
Generalized control-limit preventive repair policies for deteriorating cold and warm standby Markovian systems
Yonit Barron et al.
IISE TRANSACTIONS (2017)
Preventive maintenance in an unreliable M/G/1 retrial queue with persistent and impatient customers
Samira Taleb et al.
ANNALS OF OPERATIONS RESEARCH (2016)
Optimisation of preventive maintenance grouping strategy for multi-component series systems: Particle swarm based approach
N. Chalabi et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2016)
Group replacement policies for a repairable cold standby system with fixed lead times
Yonit Barron
IIE TRANSACTIONS (2015)
Optimal maintenance scheduling for a complex manufacturing system subject to deterioration
Reza Ahmadi
ANNALS OF OPERATIONS RESEARCH (2014)
Cold vs. hot standby mission operation cost minimization for 1-out-of-N systems
Gregory Levitin et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2014)
Performance and reliability analysis of an M/G/1-G retrial queue with orbital search and non-persistent customers
Shan Gao et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2014)
Availability of a repairable retrial system with warm standby components
Jau-Chuan Ke et al.
INTERNATIONAL JOURNAL OF COMPUTER MATHEMATICS (2013)
Operating characteristics of a failure counting group replacement policy
Young K. Yoo
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE (2011)
An M/G/1 retrial queue with an unreliable server and general repair times
G. Falin
PERFORMANCE EVALUATION (2010)
Approximation algorithm for evaluating time-to-failure distribution of k-out-of-n system with shared standby elements
Gregory Levitin et al.
RELIABILITY ENGINEERING & SYSTEM SAFETY (2010)
On multiserver feedback retrial queue with finite buffer
B. Krishna Kumar et al.
APPLIED MATHEMATICAL MODELLING (2009)
Availability and reliability of k-out-of-(M plus N):G warm standby systems
TL Zhang et al.
RELIABILITY ENGINEERING & SYSTEM SAFETY (2006)
Analysis of R out of N systems with several repairmen, exponential life times and phase type repair times:: An algorithmic approach
Y Barron et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2006)
Analysis of R-out-of-N repairable systems:: The case of phase-type distributions
Y Barron et al.
ADVANCES IN APPLIED PROBABILITY (2004)
The reliability analysis of balking and reneging in a repairable system with warm standbys
JC Ke et al.
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL (2002)
The relationship between preventive maintenance and manufacturing system performance
D Gupta et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2001)
Reliability analysis of the retrial queue with server breakdowns and repairs
JT Wang et al.
QUEUEING SYSTEMS (2001)
Performance modelling of the M/G/1 machine repairman problem with cold-, warm- and hot-standbys
TSSS Rao et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2000)