Related references
Note: Only part of the references are listed.Dynamic resource levelling in projects under uncertainty
Hongbo Li et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2023)
Incorporation of resource reliability into critical chain project management buffer sizing
Seyed Ashkan Zarghami et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2020)
New strategies for stochastic resource-constrained project scheduling
Salim Rostami et al.
JOURNAL OF SCHEDULING (2018)
Dynamic order acceptance and capacity planning in a stochastic multi-project environment with a bottleneck resource
Philipp Melchiors et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2018)
The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review
Nestor Raul Ortiz-Pimiento et al.
JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM (2018)
Approximate policy iteration for dynamic resource-constrained project scheduling
Mahshid Salemi Parizi et al.
OPERATIONS RESEARCH LETTERS (2017)
Resource-constrained multi-project scheduling: Priority rule performance revisited
Tyson R. Browning et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2010)
A genetic algorithm for the resource constrained multi-project scheduling problem
J. F. Goncalves et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)
Dynamic order acceptance and capacity planning on a single bottleneck resource
Jade Herbots et al.
NAVAL RESEARCH LOGISTICS (2007)
A Q-Learning-based method applied to stochastic resource constrained project scheduling with new project arrivals
Jaein Choi et al.
INTERNATIONAL JOURNAL OF ROBUST AND NONLINEAR CONTROL (2007)
Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology
I Cohen et al.
ANNALS OF OPERATIONS RESEARCH (2005)