4.7 Article

Optimization modeling of mixed gas engine types with different maintenance spans and costs: Case study OF CCHP to evaluate optimal gas engine operations and combination of the types

Journal

ENERGY
Volume 222, Issue -, Pages -

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2021.119823

Keywords

CCHP; Gas engine; Maintenance; District heating and cooling; Optimization; Economical evaluation

Ask authors/readers for more resources

This study aims to model the optimal operation and maintenance plan of CCHP combining High-speed type and Medium-speed type gas engines, considering the effectiveness of actual maintenance schedule from an economic perspective. Results show that the proposed methodology decreases annual operation costs and optimizes maintenance work quantity by controlling engine operation hours through detailed maintenance optimization. Combining two types of engines is better than using one type, indicating the effectiveness of the proposed methodology in deriving the optimal configuration of CCHP.
Combined cooling, heat and power supply systems (CCHP) are expected as a method of efficient use of energy, and gas engines are installed for power and heat supply for them in many cases of District heat and power supply (DHC). Conventionally, it presupposed that the same type of multiple gas engines is installed in a site, and considering the terms of maintenance is only calculate the cost by simple multiplication with assumed unit price. There are two types for gas engines for CCHP such as High-speed type and Medium-speed type depending on the rated rotation speed. The characteristics are different in terms of initial cost, efficiency, and maintenance, and it is possible to install them on one site. Therefore, the objectives of this research are to model the optimal operation of CCHP combining High-speed type and Medium-speed type with the detail maintenance process that several stages are determined by operation hours for each type and to verify the effectiveness of vicarious combinations of different type gas engines and their operation from the economical point of view considering actual maintenance schedule. It is necessary to consider not only the load balance of each equipment but also the elapsed time axis to optimize actual maintenance activities because the maintenance timing is determined by the accumulation of operation hours. In this study, developed the methodology to solve the optimum operation plan of CCHP and the optimum maintenance plan of the gas engines at the same time, and the examined case was a DHC with 3 units of 3800 kW gas engines for the operation of 1 year. The results indicate that the proposed methodology is useful since the annual operation cost is decreased compared with the conventional method. By the optimization considering detail maintenance, engines? operation hours are controlled to optimize the number of maintenance work even among the same types. A combination of the two types would be better than the system with one type. It implies that the pro-posed methodology is effective to derive the optimal configuration of CCHP. ? 2021 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available