Related references
Note: Only part of the references are listed.A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs
Tom Servranckx et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2019)
An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the Resource Constrained Project Scheduling Problem
Dmitry Arkhipov et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2019)
Multi-method based algorithm for multi-objective problems under uncertainty
Forhad Zaman et al.
INFORMATION SCIENCES (2019)
New strategies for stochastic resource-constrained project scheduling
Salim Rostami et al.
JOURNAL OF SCHEDULING (2018)
Scenario tree reduction methods through clustering nodes
Zhiping Chen et al.
COMPUTERS & CHEMICAL ENGINEERING (2018)
A Path-Relinking algorithm for the multi-mode resource-constrained project scheduling problem
Albert Einstein Fernandes Muritiba et al.
COMPUTERS & OPERATIONS RESEARCH (2018)
An exact composite lower bound strategy for the resource-constrained project scheduling problem
Jose Coelho et al.
COMPUTERS & OPERATIONS RESEARCH (2018)
A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem
M. E. Bruni et al.
COMPUTERS & OPERATIONS RESEARCH (2018)
Efficient priority rules for the stochastic resource-constrained project scheduling problem
Zhi Chen et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2018)
An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case
Roubila Lilia Kadri et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2018)
Scenario-based Solution Approach for Uncertain Resource Constrained Scheduling Problems
Forhad Zaman et al.
2018 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC) (2018)
Consolidated optimization algorithm for resource-constrained project scheduling problems
Saber Elsayed et al.
INFORMATION SCIENCES (2017)
An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
M. E. Bruni et al.
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE (2017)
Resource constrained project scheduling with uncertain activity durations
Ripon K. Chakrabortty et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2017)
A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling
Jieguang He et al.
COMPUTERS & OPERATIONS RESEARCH (2016)
Evolutionary algorithms for power generation planning with uncertain renewable energy
Forhad Zaman et al.
ENERGY (2016)
Evolutionary Algorithms for Dynamic Economic Dispatch Problems
M. F. Zaman et al.
IEEE TRANSACTIONS ON POWER SYSTEMS (2016)
A Differential Evolution Algorithm for Solving Resource Constrained Project Scheduling Problems
Ismail M. Ali et al.
ARTIFICIAL LIFE AND COMPUTATIONAL INTELLIGENCE, ACALCI 2016 (2016)
Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
Haitao Li et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2015)
An estimation of distribution algorithm and new computational results for the stochastic resource-constrained project scheduling problem
Chen Fang et al.
FLEXIBLE SERVICES AND MANUFACTURING JOURNAL (2015)
Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
Stefan Creemers
JOURNAL OF SCHEDULING (2015)
Construction and evaluation framework for a real-life project database
Jordy Batselier et al.
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2015)
Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problems
Min-Yuan Cheng et al.
AUTOMATION IN CONSTRUCTION (2014)
An improved particle swarm optimization for the resource-constrained project scheduling problem
Qiong Jia et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2013)
New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing
Behzad Ashtiani et al.
JOURNAL OF SCHEDULING (2011)
Resource-Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations
Francisco Ballestin et al.
PRODUCTION AND OPERATIONS MANAGEMENT (2009)
A hybrid genetic algorithm for the resource-constrained project scheduling problem
Vicente Valls et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)
A scenario planning approach for the flood emergency logistics preparation problem under uncertainty
Mei-Shiang Chang et al.
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW (2007)
When it is worthwhile to work with the stochastic RCPSP?
Francisco Ballestin
JOURNAL OF SCHEDULING (2007)
A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem
Dieter Debels et al.
OPERATIONS RESEARCH (2007)