4.5 Article

Optimal opportunistic tamping scheduling for railway track geometry

Journal

STRUCTURE AND INFRASTRUCTURE ENGINEERING
Volume 17, Issue 10, Pages 1299-1314

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/15732479.2020.1809467

Keywords

Degradation; genetic algorithms; logistic regression; Maintenance; optimal scheduling; railway tracks; tamping

Funding

  1. Trafikverket (the Swedish Transport Administration)
  2. Lulea Railway Research Center (JVTC)
  3. Bana Vag For Framtiden (BVFF)

Ask authors/readers for more resources

This study aims to optimize opportunistic tamping scheduling to minimize total maintenance costs and the number of unplanned tamping activities. A mixed integer linear programming model and a genetic algorithm are used to define and solve the track geometry tamping scheduling problem. Considering isolated defects and standard deviation helps plan maintenance activities more accurately. Speed of tamping machine and unused life of track sections should be considered for realistic results.
This study has been dedicated to the optimization of opportunistic tamping scheduling. The aim of this study has been to schedule tamping activities in such a way that the total maintenance costs and the number of unplanned tamping activities are minimized. To achieve this, the track geometry tamping scheduling problem was defined and formulated as a mixed integer linear programming (MILP) model and a genetic algorithm was used to solve the problem. Both the standard deviation of the longitudinal level and the extreme values of isolated defects were used to characterize the track geometry quality and to plan maintenance activities. The performance of the proposed model was tested on data collected from the Main Western Line in Sweden. The results show that different scenarios for controlling and managing isolated defects will result in optimal scheduling plan. It is also found that to achieve more realistic results, the speed of the tamping machine and the unused life of the track sections should be considered in the model. Moreover, the results show that prediction of geometry condition without considering the destructive effect of tamping will lead to an underestimation of the maintenance needs by 2%.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available