4.6 Article

Cost Benefit Analysis for V2G Implementation of Electric Vehicles in Distribution System

Journal

IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS
Volume 56, Issue 5, Pages 5963-5973

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TIA.2020.2986185

Keywords

Reactive power; Job shop scheduling; Vehicle-to-grid; Batteries; Planning; State of charge; Avalanche photodiodes; Active power dispatch; distribution system reconfiguration; electric vehicles; reactive power dispatch

Funding

  1. Ministry ofElectronics and IT(MIETY), India [1000110674]

Ask authors/readers for more resources

Electric vehicles (EVs) offer a significant potential towards developing transportation systems with low carbon footprint. However, a proper accommodation of EVs poses significant challenges to distribution system planning and operations. This article aims to investigate EVs scheduling strategies with cost benefit analysis (CBA) to obtain optimal planning scheme. EVs can either behave as load or as distributed energy resource, a concept referred to as vehicle to grid (V2G). A V2G capable vehicle can offer active power support and reactive power support to the distribution system. To maximize the benefits of integrating EVs in the distribution system, charging of EVs needs to be coordinated with the available V2G technology. In this study, two scheduling strategies are implemented considering active power dispatch (APD) and reactive power dispatch (RPD) from the EVs. The objective of both the strategies is to minimize losses in the system by utilizing V2G operation of the EVs. APD based strategy minimize losses by optimal charging and discharging of the EVs. On the other hand, RPD based strategy minimize losses by optimal charging and reactive power injection from the EVs. Furthermore, cost and benefit analysis of developed EVs scheduling strategies is presented from the planning perspective. Finally, the constructive influence of distribution system reconfiguration (DSR) is evaluated on operation and planning of the system with two different scheduling strategies. Simulations are conducted on a 33-bus distribution system to demonstrate the effectiveness and feasibility of the proposed approach.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available