4.7 Article

A bi-objective truck scheduling problem in a cross-docking center with probability of breakdown for trucks

Journal

COMPUTERS & INDUSTRIAL ENGINEERING
Volume 96, Issue -, Pages 180-191

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2016.03.023

Keywords

Cross docking; Truck scheduling; Multi-objective optimization; Breakdown; Response surface methodology; Meta-heuristics

Funding

  1. University of Tehran [8106043/1/27]

Ask authors/readers for more resources

This paper addresses a truck scheduling problem in a cross-docking center, in which trucks may confront breakdowns during their service times. In fact, the number of breakdowns in one unit of time for each truck follows a Poisson distribution function. On the other hand, customers are promised to receive required items in a pre-determined time; so, a due date is assigned to each outbound truck. Thus, a bi-objective linear mathematical model is developed inspired by models in the body of the respective literature. A complete enumeration method is employed to find optimum solutions subject to the complexity of large-scale problems, and we modify three multi-objective meta-heuristics; namely, Non-dominated Sorting Genetic Algorithm II (NSGA-II), Multi-Objective Simulated Annealing (MOSA) and Multi-Objective Differential Evolutionary (MODE). In addition, a Response Surface Methodology (RSM) as a statistical tool is used to find an appropriate amount of factors associated with the forgoing meta-heuristics. Finally, the performances of the proposed meta-heuristics are measured and compared with each other. (C) 2016 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available