4.4 Article

China's overcapacity industry evaluation based on TOPSIS grey relational projection method with mixed attributes

Journal

GREY SYSTEMS-THEORY AND APPLICATION
Volume 11, Issue 2, Pages 288-308

Publisher

EMERALD GROUP PUBLISHING LTD
DOI: 10.1108/GS-03-2020-0033

Keywords

Overcapacity; Mixed attributes; Combined weight; Grey relational projection method

Ask authors/readers for more resources

This study establishes an evaluation index system from four aspects and uses a mixed multi-attribute TOPSIS grey relational projection group decision method to rank the seven major overcapacity industries, providing a reference for government to formulate targeted policies and measures. The findings show the relative overcapacity degree of each industry more clearly, helping promote healthy and orderly economic development and avoid resource waste caused by overcapacity.
Purpose This paper takes the seven overcapacity industries such as the textile industry, electricity and heat, steel, coal, automobile manufacturing, nonferrous metals and petrochemical industry as research objects and proposes a TOPSIS grey relational projection group decision method with mixed multiattributes, which is used for the ranking of the seven industries with overcapacity and provided relevant departments with a basis for decision-making. Design/methodology/approach First, an evaluation index system from four aspects is established. Secondly, the attributes of linguistic information are converted into two-dimensional interval numbers and triangular fuzzy numbers, and an evaluation matrix is constructed and normalized. This paper uses the AHP method to determine the subjective weights and uses the coefficient of variation method to determine the objective weights. Moreover, this paper sets up the optimization model with the largest comprehensive evaluation value to determine the combined weights. Finally, the TOPSIS grey relational projection method is proposed to calculate the closeness of grey relational projections and to rank them. Findings This paper analyzes the problem of overcapacity in seven industries with the TOPSIS grey relational projection method. The results show that the four industries of automobile manufacturing, textile, coal and petrochemical are all in serious overcapacity levels, while the three industries of steel, nonferrous metals and electric power are relatively in weak overcapacity level in the three years of 2016-2018. TOPSIS grey relational projection method ranks the overcapacity degree of the seven major overcapacity industries, making the relative overcapacity degree of each industry more clear and providing a reference for the government to formulate targeted policies and measures for each industry. Practical implications By using TOPSIS grey relational projection method to evaluate the overcapacity of the seven major overcapacity industries, on the one hand, it makes the relative overcapacity degree of each industry more clear, on the other hand, it can provides the basis for the government and decision-making departments. This helps them promote better the healthy and orderly economic development of the seven major industries and avoid resource waste caused by overcapacity. Originality/value This article solves the single evaluation method caused by the limited indicators in the past, combines TOPSIS and the grey relational projection method and applies it to the overcapacity evaluation of the industry, not only applies it to the evaluation of overcapacity for the first time but also involves novel problems and methods, which expands the scope of application of the model.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.4
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available