4.7 Article

Drone scheduling for construction site surveillance

Journal

Publisher

WILEY
DOI: 10.1111/mice.12593

Keywords

-

Funding

  1. Massey University Research Fund

Ask authors/readers for more resources

The article explores the use of drones for monitoring construction sites as a flexible method with low manpower costs. It presents a drone scheduling problem and solution, with a case study demonstrating the applicability of the model.
Using drones to monitor construction site is a flexible approach with low manpower costs. We study a drone scheduling problem in which a drone flies on a fixed path over a construction site. The flying speed of the drone is optimized to ensure that the drone spends the most time monitoring areas of the construction site that deserve the most attention while ensuring that the drone completes the route within a certain time and without depleting its battery. We propose a nonlinear optimization model for the problem and develop a dynamic programming algorithm to solve the model. A case study is carried out to demonstrate the applicability of the proposed drone scheduling model.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available