Purpose There is often a lack of accurate performance evaluation in Public-Private Partnership (PPP) projects. It is a challenging issue to effectively use Building Information Modeling (BIM) for PPP project performance evaluation. The objective of this study is to develop a PPP project performance evaluation model based on Industry Foundation Classes (IFC) and an enhanced matter-element method to more precisely evaluate PPP project performance. Design/methodology/approach The performance evaluation of PPP projects in the construction and operation period was explored. The PPP project performance evaluation indicator system was first established based on a literature review and PPP project practice. Then, the evaluation indicator information was expressed through IFC mapping and extension. After that, an IFC-based PPP project performance evaluation model was developed, and a case study was provided to validate the use of the proposed performance evaluation model. Findings The results of the case study show that the proposed approach can accurately and efficiently evaluate PPP projects, and it could favorably contribute to performance evaluation in PPP projects. Originality/value The performance evaluation of PPP projects utilizing IFC extension and the enhanced matter-element method provides guidance for the government and private parties to accurately and efficiently evaluate PPP project performance.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available